Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Geological Survey (USGS) seeks a contractor to renovate Well No. 1 at the Columbia Environmental Research Center (CERC) in Columbia, MO, including removal of biological buildup, debris removal, disinfection, and reinstallation of pump/motor components and safety/monitoring equipment. This requirement is a 100% total small business set-aside under NAICS 237110 with an estimated contract value of $100,000–$250,000; vendors must provide materials, labor, bonds and insurance and meet Davis-Bacon and Buy American requirements. Written quotes must be emailed to krschneider@usgs.gov by Feb 11, 2026 at 5:00 PM EST; a mandatory site visit is scheduled for Feb 5, 2026 at 9:00 AM local time.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The U.S. Geological Survey (USGS) Columbia Environmental Research Center (CERC) is soliciting quotes to renovate Well No. 1 in Columbia, MO per the solicitation Statement of Work. This procurement is issued as a 100% Total Small Business set-aside under NAICS 237110 with an estimated construction magnitude between $100,000 and $250,000. Quotes must be submitted via email to the primary contact by the deadline of February 11, 2026.
Posted Date
Jan 29, 2026
Due Date
Feb 11, 2026
Release: Jan 29, 2026
Close: Feb 11, 2026
The U.S. Geological Survey (USGS) Columbia Environmental Research Center (CERC) is soliciting quotes to renovate Well No. 1 in Columbia, MO per the solicitation Statement of Work. This procurement is issued as a 100% Total Small Business set-aside under NAICS 237110 with an estimated construction magnitude between $100,000 and $250,000. Quotes must be submitted via email to the primary contact by the deadline of February 11, 2026.
AvailablePerform renovations on well #1.
Posted Date
Jan 29, 2026
Due Date
Feb 11, 2026
Release: Jan 29, 2026
Close: Feb 11, 2026
Perform renovations on well #1.
AvailableRelease: Jan 23, 2026
Close: Feb 12, 2026
Well No. 1 and Appurtenances
AvailableThe Project includes the following Work for the Collector Well No. 1 Structural/Electrical Upgrades: Reconstruction of the concrete roof to accommodate new access hatches; new membrane roof material; removal of existing electrical conduit and devices impacted by roof reconstruction; provide new 480-volt panelboard, and variable frequency drives for new pumps, new conduit, wiring, and lighting along the roof; and work as specified herein and as shown on the Drawings. The Project includes the following Work for the Collector Well No. 1 Well Reconstruction: Abandonment of one lateral; provide two new 12-inch-diameter laterals; rehabilitation of two existing laterals; pumping tests on Collector Well No. 1 to determine capacity; provide two new pumps and motors sized for the new well capacity; cored opening at top of caisson wall for drain line; connection of sludge lagoon effluent line from Manhole 3 to Collector Well No. 1 caisson; provide new vertical drain line and supports inside the caisson; two test wells.
Posted Date
-
Due Date
Feb 10, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 10, 2026
The Project includes the following Work for the Collector Well No. 1 Structural/Electrical Upgrades: Reconstruction of the concrete roof to accommodate new access hatches; new membrane roof material; removal of existing electrical conduit and devices impacted by roof reconstruction; provide new 480-volt panelboard, and variable frequency drives for new pumps, new conduit, wiring, and lighting along the roof; and work as specified herein and as shown on the Drawings. The Project includes the following Work for the Collector Well No. 1 Well Reconstruction: Abandonment of one lateral; provide two new 12-inch-diameter laterals; rehabilitation of two existing laterals; pumping tests on Collector Well No. 1 to determine capacity; provide two new pumps and motors sized for the new well capacity; cored opening at top of caisson wall for drain line; connection of sludge lagoon effluent line from Manhole 3 to Collector Well No. 1 caisson; provide new vertical drain line and supports inside the caisson; two test wells.
Available