CityFL
May 12, 2026
Closes
Aug 24, 2026
Deep Injection Well (RFP) -*REBID*
Work includes construction of a deep injection well.
Description: Project includes services related to the Mechanical Integrity Testing (MIT) of existing deep injection well IW-1. Testing includes downhole video surveys, pressure testing, high-resolution temperature logging, and radioactive tracer surveying in the 3,340-foot-deep injection well. In addition, the Bidder shall replace the existing effluent flowmeter with owner-furnished flowmeters.
City · FL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityFL
May 12, 2026
Closes
Aug 24, 2026
Work includes construction of a deep injection well.
CitySC
Jul 20, 2026
Closes
Aug 18, 2026
Perform well testing services for an existing drinking water supply well including but not limited to, brushing and bailing, video inspection, 24-hr pump drawdown testing, and water quality testing.
CityFL
Jul 28, 2026
Closes
Sep 1, 2026
The City of Plantation, Florida is soliciting bids for the Central WTP SCADA Upgrade project (ITB No. 051-26), involving construction, upgrade, and modernization of a complete SCADA control system at the Central Water Treatment Plant located at 700 NW 91st Avenue, Plantation, FL 33324. The bid was broadcast on July 28, 2026 with sealed proposals due electronically by 11:00 AM Eastern on September 1, 2026. Ayesha Mohammed of the City's Procurement Department is listed as the contact via DemandStar.
Snoqualmie Pass Utility District
Special DistrictWA
Jul 30, 2026
Closes
Aug 20, 2026
Construct a new potable water well for municipal use that replaces an existing well to improve system reliability. The well will be constructed to obtain the greatest possible yield (approx 350 gpm) within the limits of well depth (approx. 600 LF) and 12" diameter The well will be drilled through unconsolidated and consolidated formations using rotary drilling methods. Well construction includes a surface seal, grouting, casing, well screen, development, disinfection, pumping tests, and site cleanup.
Procurement and program contacts connected to City of Plantation.