Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of 3,828 LF of 96" fiberglass wastewater interceptor; Connection, inspection, and activation of the existing 30MC-1 interceptor; Reconnection of two Dallas Water Utilities points of entry; Abandonment of existing wastewater interceptors and junction structure; Approx. 64 LF 24" SDR 26 PVC Sanitary Sewer Pipe by Open Cut;
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes approx. 1,480 LF of 66" to 84" gravity wastewater line by open-cut; 1,000 LF of 84" gravity wastewater line by-other-than-open-cut; 1,670 LF of 54" to 84" gravity wastewater line by open-cut; 200 LF of 66" gravity wastewater by-other-than-open-cut; 80 LF of 48" wastewater by open-cut; 200 LF of 18" polyvinyl chloride (PVC) Force Main; 160 LF of 8" HDPE Sanitary Sewer Pipe By Open-Cut (All Depths) 11 - connections to existing interceptors and points-of-entry; 17 FRP or polymer manholes; Two - Fiberglass Junction Boxes; Pipeline construction and earthwork across two (2) locations of creek and aerial crossings, including construction of a cofferdam and rebuilding a spillway structure; 500 LF of storm drain replacement per TxDOT standards; 50 LF of waterline relocation; Grout filling of existing interceptors, manholes, and junction structures; Relocation of fiber optic and underground electric lines
Posted Date
Dec 16, 2025
Due Date
Feb 11, 2026
Release: Dec 16, 2025
Close: Feb 11, 2026
Work includes approx. 1,480 LF of 66" to 84" gravity wastewater line by open-cut; 1,000 LF of 84" gravity wastewater line by-other-than-open-cut; 1,670 LF of 54" to 84" gravity wastewater line by open-cut; 200 LF of 66" gravity wastewater by-other-than-open-cut; 80 LF of 48" wastewater by open-cut; 200 LF of 18" polyvinyl chloride (PVC) Force Main; 160 LF of 8" HDPE Sanitary Sewer Pipe By Open-Cut (All Depths) 11 - connections to existing interceptors and points-of-entry; 17 FRP or polymer manholes; Two - Fiberglass Junction Boxes; Pipeline construction and earthwork across two (2) locations of creek and aerial crossings, including construction of a cofferdam and rebuilding a spillway structure; 500 LF of storm drain replacement per TxDOT standards; 50 LF of waterline relocation; Grout filling of existing interceptors, manholes, and junction structures; Relocation of fiber optic and underground electric lines
AvailableInstallation of a chemical feed system, sodium thiosulfate, for wastewater effluent dechlorination. Installing underground chemical feed piping and tubing. Installation of open-channel flow measurement instrumentation and metal v-notch weirs. Electrical improvements related thereto. SCADA integration. Restoration of disturbed areas.
Posted Date
Jan 2, 2026
Due Date
Jan 27, 2026
Release: Jan 2, 2026
Close: Jan 27, 2026
Installation of a chemical feed system, sodium thiosulfate, for wastewater effluent dechlorination. Installing underground chemical feed piping and tubing. Installation of open-channel flow measurement instrumentation and metal v-notch weirs. Electrical improvements related thereto. SCADA integration. Restoration of disturbed areas.
AvailableWork includes demolition outlined in this contract which will include but not limited to: pumps base demolition; pipe pedestals; old seal water system station; new construction: new pump bases; new pipe pedestals; new seal water system; new backflow preventer mounted to the wall with a new stainless steel bracket; new exhaust fans and ductwork (3); installation of two (2) new fluid engineering series 723 eliminator self-cleaning strainer, along with four (4) 20 in dezurik butterfly isolation valves and four (4) 20 in victaulic couplings. See attached file.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
Work includes demolition outlined in this contract which will include but not limited to: pumps base demolition; pipe pedestals; old seal water system station; new construction: new pump bases; new pipe pedestals; new seal water system; new backflow preventer mounted to the wall with a new stainless steel bracket; new exhaust fans and ductwork (3); installation of two (2) new fluid engineering series 723 eliminator self-cleaning strainer, along with four (4) 20 in dezurik butterfly isolation valves and four (4) 20 in victaulic couplings. See attached file.
Provide regional wastewater flow forecast model update services.
Posted Date
Jan 10, 2026
Due Date
Jan 31, 2026
Release: Jan 10, 2026
Close: Jan 31, 2026
Provide regional wastewater flow forecast model update services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis