Closing soon

Center Rd Bridge T-403 RFP

Description: Project consists of a bridge replacement on center road over bixler run with a single-span composite prestressed pa-bulb tee beam bridge on the same alignment. Work also includes minor approach work, guide rail updates, roadway reconstruction, and other miscellaneous construction. Description: 1 ls of clearing and grubbing; 193 cy of class 1 excavation; 4 cy of class 4 excavation; 270 cy of foreign borrow excavation; 12 cy of selected borrow excavation rock, class r-4; 566 sy of superpave asphalt mixture design, base course, pg 64s-22, < 0. 3 million esals, 25.0 mm mix, 4 1/2" depth; 669 sy of subbase 6" depth (no. 2a); 118 ton of subbase (no. 2a); 721 sy of superpave asphalt mixture design, wearing course, pg 64s-22, < 0.3 million esals, 9.5 mm mix, 1 1/2" depth, srl-l. See attached file.

Released
Nov 9, 2026
Closes
Dec 3, 2026(8 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts