Northwest Shoals Community College
Higher EducationAL
Posted
-
Dec 17, 2026
Description: Construction of Cell 9 and Phase II Capping includes the construction of stormwater management facilities, excavation/fill, waste relocation, sliver filling with pre-compacted waste, access roads, bottom liner, landfill cap, leachate collection system, gas lines, stockpiling, hauling, fencing, landscaping, and all incidentals outlined in the Project Plans and Specifications. The Electrical Bid for the Construction of Cell 9 and Phase II Capping includes all the labor, materials, tools, supervision, transportation, and equipment necessary to complete the electrical installation as indicated on the Project Plans and Specifications.
SpecialDistrict · PA, US
Decision makers connected to this RFP from Greater Lebanon Refuse Authority.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
110 days before RFP
GLRA expected to begin Cell 9 construction and Schilling Capping in mid-2027 after resolving closure-cost calculations and obtaining the surety bond.
Once we come to an agreement with the Department on the cost for closure calculations, we need to forge ahead with obtaining the surety bond and subsequent dissolution of the trust as we fully expect to begin Cell 9 construction and Schilling Capping mid-2027.
Greater Lebanon Refuse Authority Board Meeting Minutes
Board meeting · Aug 5, 2026
Board meeting
75 days before RFP
The GLRA Board approved authorizing staff to proceed with requests for bids for construction of Cell 9 and Phase II capping.
STAFF ENGINEER'S REPORT A copy of the report is attached and hereto made part of the minutes. On a MOTION by Neiswender, SECONDED by Lindsay, Members APPROVED to authorize staff to proceed with requests for bids for the construction of Cell 9 and Phase II capping of the Schilling Landfill.
Greater Lebanon Refuse Authority Board Of Directors Meeting Minutes
Board meeting · Sep 9, 2026
Board meeting
48 days before RFP
James Zendek reported draft Cell 9 and Phase II Capping plans, successful project testing, and a pending minor permit modification for Cell 9 grading.
Zendek updated the Board on the draft of the Construction Plans for the Cell 9 and Phase II Capping Project. PID testing allowed us to check emissions on the excavated waste and soil testing was conducted on the Diem farm, both rendered successful results. Additional good news was shared that the latest round of quarterly surveying from Hershey construction…
Greater Lebanon Refuse Authority Board of Directors Meeting Minutes
Board meeting · Oct 6, 2026
Board meeting
19 days before RFP
GLRA's team commenced the Cell 9 subsoil placement project and placed 5,500 cubic yards during nine days of work.
OPERATION MANAGER'S REPORT A copy of the report is attached and hereto made part of the minutes. The subsoil placement project for Cell 9 commenced, and our team executed nine days of work, successfully placing 5,500 cubic yards.
Greater Lebanon Refuse Authority Board of Directors Meeting Minutes
Board meeting · Nov 4, 2026
RFP published
Proposals due (26 days left)
Adjacent opportunities open for bidding right now.
Northwest Shoals Community College
Higher EducationAL
Posted
-
Dec 17, 2026
Work includes campus plan.
FederalDC
Posted
Nov 17, 2026
Dec 11, 2026
Room 1: 1. Executive level conference table with DOJ seal engraved in center of the table. 2. Enhanced appearance with new drywall, fresh paint, and decor; and 3. New desk to match conference room table with enough space for four (4); and enclaves, one (1) keyboard, one (1) mouse, two (2) monitors, and one (1) KVM; and. 4. Unclassified Telephone Security Group (TSG) 6 approved speaker phone. 5. Hidden but easily accessible cable raceway; and. 6. New executive level furniture to include credenza,, and end tables; and. 7. TotalMass MassLoaded Vinyl (MLV) Barrier (sounds dampening material which meets Sound Transmission Class (STC) 50 sound attenuation requirements); and. 8. Replace existing carpet with new carpet tiles (unique to AG Conference Room space). See attached file.
CityTN
Posted
Nov 17, 2026
Nov 30, 2026
Fabrication and installation of exterior and interior wayfinding signage.
Forrest City Housing Authority
Special DistrictAR
Posted
Nov 22, 2026
Dec 16, 2026
Work includes new flooring, interior painting, lowering of existing ceilings with electrical and mechanical.