Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the following approximate quantities: 9,010 LF of cleaning and CCTV inspection of 8" sanitary sewer; 300 LF of CCTV service lines; 5,512 LF of 8" cured-in-place pipe; 4 paved area 8" sewer main point repairs; 40 paved area 8" sewer main additional pipe (assorted sizes); 6 non-paved area 8" sewer main point repairs; 60 non-paved area 8" sewer main additional pipe (assorted sizes); 12 service line reconnects (paved/non-paved); 4 manhole inserts; 400 CY of root inhibitor; 300 LF of seeding/mulching.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP seeks proposals for the construction of the Town of Utica Proposed Sanitary Sewer System Improvement Project, involving rehabilitation and improvements to the existing sewer collection system.
Posted Date
Dec 17, 2025
Due Date
Jan 26, 2026
Release: Dec 17, 2025
Close: Jan 26, 2026
This RFP seeks proposals for the construction of the Town of Utica Proposed Sanitary Sewer System Improvement Project, involving rehabilitation and improvements to the existing sewer collection system.
AvailableProject consist of repair of the sanitary sewer system associated with pipe bursting and manhole repair.
Posted Date
Jan 8, 2026
Due Date
Jan 20, 2026
Release: Jan 8, 2026
Close: Jan 20, 2026
Project consist of repair of the sanitary sewer system associated with pipe bursting and manhole repair.
AvailableGeneral Contract for the construction of a sewer rehabilitation project, including video inspection of sewer lines, CIPP lining, and CIPP lateral linings.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
General Contract for the construction of a sewer rehabilitation project, including video inspection of sewer lines, CIPP lining, and CIPP lateral linings.
AvailableThe City of Donalsonville (Seminole County, GA) is soliciting bids for construction of Flooding, Street, & Drainage System Improvements to serve the Highland Neighborhood under CDBG-MIT funding. The work includes grading roadside ditches, installing storm and driveway piping, constructing outfall ditches, resurfacing roadways, lowering existing water and gas main services, erosion and sediment control, and all associated measures; performance is roughly 180 days to substantial completion and 194 days total for close-out. Bidders must be licensed in Georgia, submit a bid bond of at least 10% of the bid, and provide 100% performance and payment bonds; the posting links to the Georgia procurement registry and lists a response deadline of 2026-01-29.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Donalsonville (Seminole County, GA) is soliciting bids for construction of Flooding, Street, & Drainage System Improvements to serve the Highland Neighborhood under CDBG-MIT funding. The work includes grading roadside ditches, installing storm and driveway piping, constructing outfall ditches, resurfacing roadways, lowering existing water and gas main services, erosion and sediment control, and all associated measures; performance is roughly 180 days to substantial completion and 194 days total for close-out. Bidders must be licensed in Georgia, submit a bid bond of at least 10% of the bid, and provide 100% performance and payment bonds; the posting links to the Georgia procurement registry and lists a response deadline of 2026-01-29.