Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of approx. 11,389 LF of HP pipe, 213,010 CY of pond excavation, 3,035 LF of roadside ditch improvements, junction boxes, and associated appurtenances
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes installation of approx 7,071 LF of concrete pipe and boxes, 12,213 CY of pond excavation, 2,792 LF of ditch excavation, 22,245 SY of HMAC pavement, as well as junction boxes, manholes, curb inlets, valley gutters, curb and gutter, sidewalk, driveway improvements, fencing and associated appurtenances.
Posted Date
Aug 29, 2025
Due Date
Jan 27, 2026
Release: Aug 29, 2025
Close: Jan 27, 2026
Work includes installation of approx 7,071 LF of concrete pipe and boxes, 12,213 CY of pond excavation, 2,792 LF of ditch excavation, 22,245 SY of HMAC pavement, as well as junction boxes, manholes, curb inlets, valley gutters, curb and gutter, sidewalk, driveway improvements, fencing and associated appurtenances.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Harris County, on behalf of the Harris County Flood Control District, is soliciting bids for channel conveyance improvements to Taylor Gully funded by CDBG-MIT, GLO, TWDB, and EPA. The project involves assessment, design, and construction activities such as excavation and grading to improve flood control infrastructure. Bidders must comply with environmental regulations and provide required certifications and insurance as detailed in the project manual and drawings available on the procurement portal.
Posted Date
Jan 23, 2026
Due Date
Feb 16, 2026
Release: Jan 23, 2026
Close: Feb 16, 2026
Harris County, on behalf of the Harris County Flood Control District, is soliciting bids for channel conveyance improvements to Taylor Gully funded by CDBG-MIT, GLO, TWDB, and EPA. The project involves assessment, design, and construction activities such as excavation and grading to improve flood control infrastructure. Bidders must comply with environmental regulations and provide required certifications and insurance as detailed in the project manual and drawings available on the procurement portal.
AvailableReplacement of approximately 2,940 LF of existing storm sewer, road reconstruction, and curb and gutter replacement.
Posted Date
Jan 9, 2026
Due Date
Feb 10, 2026
Release: Jan 9, 2026
Close: Feb 10, 2026
Replacement of approximately 2,940 LF of existing storm sewer, road reconstruction, and curb and gutter replacement.
AvailableWork includes installation of approx 4,670 LF of 4" pvc waterline including, valves, connection to existing waterlines, connection to existing water well no. 3, pavement repair, testing and sterilization, and associated appurtenances; removal and replacement of 26 manhole cones, rings, and covers; removal of approx 980,500 gallons of sludge from wwtp.
Posted Date
Jan 14, 2026
Due Date
Feb 4, 2026
Release: Jan 14, 2026
Close: Feb 4, 2026
Work includes installation of approx 4,670 LF of 4" pvc waterline including, valves, connection to existing waterlines, connection to existing water well no. 3, pavement repair, testing and sterilization, and associated appurtenances; removal and replacement of 26 manhole cones, rings, and covers; removal of approx 980,500 gallons of sludge from wwtp.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →