CityMD
Posted
Sep 8, 2026
Oct 8, 2026
Abraham Faw Run Stream Restoration (MWBE Goals)
Work includes 250 CY concrete channel demolition; 120 SY riprap demolition; 2 EA gravel construction entrance; 3,200 LF safety fence; 1,050 LF tree protection fence; 50 CY sand bag diversion; 2 ea filter bag; 1,500 SY erosion control matting (coir matting); 11,374 SY site grading (earthwork); 2 EA in-stream structures; 300 SF geotextiles (filter cloth); 25 EA tubelings; 11 EA 2" caliper trees; 60 lb ernst seeding; 12,000 SY permanent stabilization seeding.
