Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Gallup invites bids to install new waterlines along Carbon Coal Road and Industrial Park Road serving the McKinley County Industrial Park. The scope includes approximately 2,395 linear feet of 12-inch CL350 ductile iron pipe, valves, a fire hydrant assembly, tie-ins, trenching with rock excavation, backfilling, and traffic control. Bids must be submitted through the City’s OpenGov e-Procurement portal by 2:00 pm local time on January 5, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx 2,410 LF of 12" CL350 ductile iron pipe; 2 EA WWA C509 12" resilent wedge gate valve (MJxMJ) and valve box; 1 EA fire hydrant; 540 LF of 8" CL350 DIP waterline with fittings, buried. See attached file.
Posted Date
Dec 2, 2025
Due Date
Jan 5, 2026
Release: Dec 2, 2025
Close: Jan 5, 2026
Work includes approx 2,410 LF of 12" CL350 ductile iron pipe; 2 EA WWA C509 12" resilent wedge gate valve (MJxMJ) and valve box; 1 EA fire hydrant; 540 LF of 8" CL350 DIP waterline with fittings, buried. See attached file.
Premium
Access the largest public sector contact database
Holmes County solicits engineering services for infrastructure improvements at Holmes County Industrial Park (EDA project), including preparation of a Preliminary Engineering Report (PER); plans and specifications for bidding; bid evaluation and contract award recommendation; EDA-compliant contract preparation; pre-construction coordination; construction inspection; and contractor payment oversight and EDA compliance.
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
Holmes County solicits engineering services for infrastructure improvements at Holmes County Industrial Park (EDA project), including preparation of a Preliminary Engineering Report (PER); plans and specifications for bidding; bid evaluation and contract award recommendation; EDA-compliant contract preparation; pre-construction coordination; construction inspection; and contractor payment oversight and EDA compliance.
AvailableThis solicitation (public bid) requests furnishing and installation of water lines, fittings, valves, and related components for the Dillon Road and Mardi Gras Road Waterline Extension Project for Lafayette Parish Waterworks District North. Sealed bids are due in person at the Lafayette Parish Waterworks District North office or electronically via CentralBidding by 10:00 a.m. on December 29, 2025.
Posted Date
Nov 28, 2025
Due Date
Dec 29, 2025
Release: Nov 28, 2025
Close: Dec 29, 2025
This solicitation (public bid) requests furnishing and installation of water lines, fittings, valves, and related components for the Dillon Road and Mardi Gras Road Waterline Extension Project for Lafayette Parish Waterworks District North. Sealed bids are due in person at the Lafayette Parish Waterworks District North office or electronically via CentralBidding by 10:00 a.m. on December 29, 2025.
AvailableConstruction of 7,000 ft of 8-inch HDPE waterline with tie-ins to existing mains and service lines; installation of fire hydrants, gate valves, and air-vac valves. Project is bid as a single contract tied to one other project (bidders must bid all tied items). Mandatory pre-bid conference attendance required. Owner estimate ~$675,000; completion expected by 2026-11-15.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
Construction of 7,000 ft of 8-inch HDPE waterline with tie-ins to existing mains and service lines; installation of fire hydrants, gate valves, and air-vac valves. Project is bid as a single contract tied to one other project (bidders must bid all tied items). Mandatory pre-bid conference attendance required. Owner estimate ~$675,000; completion expected by 2026-11-15.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis