Summary
Work associated with the proposed project is generally described as follows: Schedule A - Intake System, Booster Station, and Treatment Facility: Replacement of existing intake system including pumps, piping, and fittings; upgrades to existing treatment facility including filter replacement, mechanical piping and fitting replacement, and installation of two new final filters replacement of existing booster station including booster pumps, mechanical piping and fittings, and building structure; and installation of new lower reservoir including tanks and piping. Schedule B - Lower Distribution: Distribution upgrades from the booster station to the lower portion of the camp (past the Lodge and Tamarack), including replacement of existing water piping and fittings and installation of new yard hydrants. Schedule C - Upper Reservoir Distribution: Distribution upgrades from the booster station to the existing upper reservoir, including replacement of existing water piping and fittings and installation of new yard hydrants. Schedule D - Upper Distribution: Distribution upgrades from the upper reservoir water line to the upper distribution area (from Connemara to Echo), including replacement of existing water piping and fittings and installation of new yard hydrants. Schedule E - Reservoir Coating: Re-coating the exterior of the existing upper reservoir and appurtenances. Schedule F - Backup Generator: Installation of a standby generator.