Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Camp Fire Inland Northwest
Work associated with the proposed project is generally described as follows: Schedule A - Intake System, Booster Station, and Treatment Facility: Replacement of existing intake system including pumps, piping, and fittings; upgrades to existing treatment facility including filter replacement, mechanical piping and fitting replacement, and installation of two new final filters replacement of existing booster station including booster pumps, mechanical piping and fittings, and building structure; and installation of new lower reservoir including tanks and piping. Schedule B - Lower Distribution: Distribution upgrades from the booster station to the lower portion of the camp (past the Lodge and Tamarack), including replacement of existing water piping and fittings and installation of new yard hydrants. Schedule C - Upper Reservoir Distribution: Distribution upgrades from the booster station to the existing upper reservoir, including replacement of existing water piping and fittings and installation of new yard hydrants. Schedule D - Upper Distribution: Distribution upgrades from the upper reservoir water line to the upper distribution area (from Connemara to Echo), including replacement of existing water piping and fittings and installation of new yard hydrants. Schedule E - Reservoir Coating: Re-coating the exterior of the existing upper reservoir and appurtenances. Schedule F - Backup Generator: Installation of a standby generator.
Posted Date
Mar 17, 2026
Due Date
Apr 10, 2026
Release: Mar 17, 2026
Camp Fire Inland Northwest
Close: Apr 10, 2026
Work associated with the proposed project is generally described as follows: Schedule A - Intake System, Booster Station, and Treatment Facility: Replacement of existing intake system including pumps, piping, and fittings; upgrades to existing treatment facility including filter replacement, mechanical piping and fitting replacement, and installation of two new final filters replacement of existing booster station including booster pumps, mechanical piping and fittings, and building structure; and installation of new lower reservoir including tanks and piping. Schedule B - Lower Distribution: Distribution upgrades from the booster station to the lower portion of the camp (past the Lodge and Tamarack), including replacement of existing water piping and fittings and installation of new yard hydrants. Schedule C - Upper Reservoir Distribution: Distribution upgrades from the booster station to the existing upper reservoir, including replacement of existing water piping and fittings and installation of new yard hydrants. Schedule D - Upper Distribution: Distribution upgrades from the upper reservoir water line to the upper distribution area (from Connemara to Echo), including replacement of existing water piping and fittings and installation of new yard hydrants. Schedule E - Reservoir Coating: Re-coating the exterior of the existing upper reservoir and appurtenances. Schedule F - Backup Generator: Installation of a standby generator.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Camp Fire Inland Northwest's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database