Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Cameron Water Main Connection solicitation requests construction work to connect to the Town of Cameron water main distribution system, including 5,278 linear feet of water main piping plus five 500 LF alternatives to extend fire services within Calhoun County. The project is Design-Bid-Build with an estimated construction cost range of $2.4 million to $3.1 million.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of 380 LF of horizontal direction bored 14" HDPE pipe, connection to existing mains in two locations, cut-in tee, valves and appurtenances, surface restoration identified as grass, native shrubs, gravel, and AC Pavement.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
Installation of 380 LF of horizontal direction bored 14" HDPE pipe, connection to existing mains in two locations, cut-in tee, valves and appurtenances, surface restoration identified as grass, native shrubs, gravel, and AC Pavement.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a water main extension and the connection of water services to adjacent residential properties. The work shall include the installation of 8" water main, water main taps, curb stops, residential connections to public water, interior plumbing work, and services with meters and all appurtenances.
Posted Date
Jan 14, 2026
Due Date
Feb 18, 2026
Release: Jan 14, 2026
Close: Feb 18, 2026
Construction of a water main extension and the connection of water services to adjacent residential properties. The work shall include the installation of 8" water main, water main taps, curb stops, residential connections to public water, interior plumbing work, and services with meters and all appurtenances.
AvailableProvide on-site plumbing connection - water.
Posted Date
Jan 19, 2026
Due Date
Jan 27, 2026
Release: Jan 19, 2026
Close: Jan 27, 2026
Provide on-site plumbing connection - water.
AvailableWater Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →