South Carolina Public Service Authority
The Cameron Water Main Connection solicitation requests construction work to connect to the Town of Cameron water main distribution system, including 5,278 linear feet of water main piping plus five 500 LF alternatives to extend fire services within Calhoun County. The project is Design-Bid-Build with an estimated construction cost range of $2.4 million to $3.1 million.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Cameron
This project will include a connection to the Town of Cameron water main distribution system. The base bid will include 5,278 LF of water main piping with five additional alternatives, each measuring 500 LF of water main piping. The proposed work will extend fire services to additional customers.
Posted Date
Nov 13, 2025
Due Date
Dec 9, 2025
Release: Nov 13, 2025
Town of Cameron
Close: Dec 9, 2025
This project will include a connection to the Town of Cameron water main distribution system. The base bid will include 5,278 LF of water main piping with five additional alternatives, each measuring 500 LF of water main piping. The proposed work will extend fire services to additional customers.
AvailableTownship of Concord
Rehabilitate the existing leaking sewer lateral connection. The rehabilitation shall be performed using a one-piece main-to-lateral cured-in-place pipe (CIPP) liner system, such as LMK Technologies’ T-Liner or approved equal, meeting ASTM F2561.
Posted Date
Nov 20, 2025
Due Date
Dec 9, 2025
Release: Nov 20, 2025
Township of Concord
Close: Dec 9, 2025
Rehabilitate the existing leaking sewer lateral connection. The rehabilitation shall be performed using a one-piece main-to-lateral cured-in-place pipe (CIPP) liner system, such as LMK Technologies’ T-Liner or approved equal, meeting ASTM F2561.
AvailableGilbert-Summit Rural Community Water District
6,050 LF - C-900 PVC water main, 8"; 2,577 LF - C-900 PVC water main, 6"; 1 ea - tee, 6"x6" MJ; 5 ea - gate valves W/bos, 8" MJ; 22 ea - service connection, open cut; 1 ea - connect new water main to existing (includes material & labor); 80 LF - steel casing, 12".
Posted Date
Oct 27, 2025
Due Date
Nov 27, 2025
Release: Oct 27, 2025
Gilbert-Summit Rural Community Water District
Close: Nov 27, 2025
6,050 LF - C-900 PVC water main, 8"; 2,577 LF - C-900 PVC water main, 6"; 1 ea - tee, 6"x6" MJ; 5 ea - gate valves W/bos, 8" MJ; 22 ea - service connection, open cut; 1 ea - connect new water main to existing (includes material & labor); 80 LF - steel casing, 12".
AvailableConcord Township
The solicitation seeks trenchless rehabilitation of a leaking sewer lateral connection at 12 Union School Way using a one-piece main-to-lateral cured-in-place pipe (CIPP) liner system meeting ASTM F2561 standards. Work includes pre-construction CCTV inspection, installation of the CIPP liner with testing/cure monitoring, and post-installation inspection, with substantial completion expected within 30 days of commencement.
Posted Date
Nov 20, 2025
Due Date
Dec 9, 2025
Release: Nov 20, 2025
Concord Township
Close: Dec 9, 2025
The solicitation seeks trenchless rehabilitation of a leaking sewer lateral connection at 12 Union School Way using a one-piece main-to-lateral cured-in-place pipe (CIPP) liner system meeting ASTM F2561 standards. Work includes pre-construction CCTV inspection, installation of the CIPP liner with testing/cure monitoring, and post-installation inspection, with substantial completion expected within 30 days of commencement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis