Summary
Contract No. 1 – General Prime Construction for the construction of interior improvements including indirect sports lighting integrated with interior light-reflective liner system, and other interior specialties. Replacement of 12-foot tall perimeter wall protection screening Install light-reflective interior liner system over and around existing steel structure and roof-hung indirectly facing LED lights at each of (4) existing tennis courts, as part of an integrated lighting system. Removal and replacement of column protection pads at steel columns. Replacement of (3) sections of divider curtains between the (4) existing tennis courts, As an Alternate Bid. No 1. Add interior insulation between the reflective liner panel and the existing steel substrates, as an Alternate Bid. General project management, meetings, schedule control, and project reporting. Contract No. 2 – Electrical Prime Construction for the construction of interior improvements including indirect sports lighting integrated with interior light-reflective liner system, and other interior specialties, to meet Substantial Completion and Final Completion in accordance with the contractors bid but Substantial Completion shall not be later than October 2, 2026; Remove existing fluorescent tube lights. Provide new LED indirect LED light fixtures, including installation of related conduits and conductors and controls. Contract 1 includes Alternate Bid 1 – Divider Curtains Contract 1 includes Alternate Bid 2 – Interior Insulation Bids are requested for the following Contract: General Construction Contract 1 and Electrical Construction Contract 2 and a Combined Contract 3.