Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of approximately 1,100 linear feet of cleaning and structural lining of 10-inch water main. Includes temporary water service, reinstating existing services
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work on the avenue sewer main lining consists of mobilization, 915 LF of pre-installation cleaning and video inspection of the sanitary sewer main, furnishing and installing 915 LF of CIPP liner, 52 vertical feet of multi-layer "stress-skin panel" liner system. Add alternate schedule 1 is as follows: 211 LF of pre-installation of cleaning and video of sanitary sewer laterals, furnish and installing a CIPP liner for the 8 laterals, installation of eight (8) 6" lateral cleanouts with sanitary sewer cleanout frames and covers.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Work on the avenue sewer main lining consists of mobilization, 915 LF of pre-installation cleaning and video inspection of the sanitary sewer main, furnishing and installing 915 LF of CIPP liner, 52 vertical feet of multi-layer "stress-skin panel" liner system. Add alternate schedule 1 is as follows: 211 LF of pre-installation of cleaning and video of sanitary sewer laterals, furnish and installing a CIPP liner for the 8 laterals, installation of eight (8) 6" lateral cleanouts with sanitary sewer cleanout frames and covers.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Keene seeks a qualified engineering firm to perform design and related services for the Court St River Crossing Water Main Replacement Project, which includes replacing approximately 5,000 linear feet of water main and installing a new 12-inch HDPE pipe including an HDD crossing beneath the Ashuelot River. The selected consultant will provide preliminary engineering and design, environmental documentation and permitting, public engagement, and construction administration support.
Posted Date
Aug 7, 2025
Due Date
Aug 7, 2026
Release: Aug 7, 2025
Close: Aug 7, 2026
The City of Keene seeks a qualified engineering firm to perform design and related services for the Court St River Crossing Water Main Replacement Project, which includes replacing approximately 5,000 linear feet of water main and installing a new 12-inch HDPE pipe including an HDD crossing beneath the Ashuelot River. The selected consultant will provide preliminary engineering and design, environmental documentation and permitting, public engagement, and construction administration support.
AvailableProject shall generally consist of installation of approx 1,215 lf of 8” diameter C900 pvc water main, appurtenances and incidental work.
Posted Date
Dec 12, 2025
Due Date
Jan 6, 2026
Release: Dec 12, 2025
Close: Jan 6, 2026
Project shall generally consist of installation of approx 1,215 lf of 8” diameter C900 pvc water main, appurtenances and incidental work.
AvailableInstallation of pipelines, meters, valves and appurtenances, and rehabilitation of existing water pipelines includes cleaning and cement mortar lining of approx. 769 LF of 60" steel water main; structural lining of approx. 540 LF of 60" steel water main; furnishing and installing valves, precast and cast in place valve vaults, air valves, blow-off valve assemblies, manholes and all appurtenant work along the 12,207 LF.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Installation of pipelines, meters, valves and appurtenances, and rehabilitation of existing water pipelines includes cleaning and cement mortar lining of approx. 769 LF of 60" steel water main; structural lining of approx. 540 LF of 60" steel water main; furnishing and installing valves, precast and cast in place valve vaults, air valves, blow-off valve assemblies, manholes and all appurtenant work along the 12,207 LF.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →