CityWA
Posted
Sep 8, 2026
Sep 29, 2026
CSO Basin 34 (I-90) Stormwater Mitigation/Separation Facility RFP
Project consists of the construction of a diversion structure, stormwater lift station, 4 modular wetland stormwater treatment systems, 4 type 2 deep drywells, 5 catch basins, associated site piping including approximately 200 LF of stormwater forcemain pipe and appurtenances including a valve vault, 380 LF of stormwater pipe of varying sizes, 250 SY hma pavement, 123 LF of sidewalk and driveways, sundry utility adjustments, and other related miscellaneous items.