Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cafeteria floor replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Cafeteria Floor Renovations General.
Posted Date
Jan 4, 2026
Due Date
Feb 10, 2026
Release: Jan 4, 2026
Close: Feb 10, 2026
Cafeteria Floor Renovations General.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes of electrical power modification and replacement, replacement of existing 480V Switchboard No. 3 (SWBD-3), replacement of existing 480V Motor Control Center No. 25 (MCC-25), re-feed of 480V power from SWBD-3 to MCC No. 30 (MCC-30).
Posted Date
Jan 24, 2022
Due Date
Jan 15, 2026
Release: Jan 24, 2022
Close: Jan 15, 2026
Project includes of electrical power modification and replacement, replacement of existing 480V Switchboard No. 3 (SWBD-3), replacement of existing 480V Motor Control Center No. 25 (MCC-25), re-feed of 480V power from SWBD-3 to MCC No. 30 (MCC-30).
AvailableThe project consists of Electrical power modification and replacement at Alvardo wastewater treatment plant. Replacement of existing 480V swithboard no 3. Replacement of 480V motor control center no 25. Re-feed of 480V power from SWBD-3
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Close: Jan 15, 2026
The project consists of Electrical power modification and replacement at Alvardo wastewater treatment plant. Replacement of existing 480V swithboard no 3. Replacement of 480V motor control center no 25. Re-feed of 480V power from SWBD-3
AvailableRemove existing floor cover throughout house, prep sub-floor, install new flooring, manipulate furniture and appliances.
Posted Date
Dec 19, 2025
Due Date
Jan 12, 2026
Release: Dec 19, 2025
Close: Jan 12, 2026
Remove existing floor cover throughout house, prep sub-floor, install new flooring, manipulate furniture and appliances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →