Renovation of two existing third-floor spaces in Slippery Rock University’s Vincent Science Center to create a General Chemistry Prep Room and an Autoclave Room, including selective demolition, new partitions, doors, and interior finishes. The project includes relocation of an existing fume hood, preparation for owner-furnished laboratory casework, sinks, and a safety shower/eyewash, plus capped utility lines and an electrical disconnect for a future autoclave. Related mechanical, plumbing, and electrical work includes new ceiling-suspended hoods, power upgrades, lighting, and air distribution, to be performed by Separate Prime Contractors with a General Contractor as Lead Prime.