U.S. Army Engineer District Norfolk
FederalVA
Posted
Sep 18, 2026
Nov 23, 2026
Description: Approx. 40,500 foot cable, copper, 61 strand, 34.5kvm, 750 kcmil, compact round soft drawn copper conductors, thermoset cross linked polyethylene 90c-rated insulation, with 420 mils insulation thickness, transversely corrugated copper tape shield for each single conductor; 3-single conductors triplexed; linear low density polyethylene jacketed, in accordance with the attached department's specifications, as last revised. Priced per 1000 circuit feet on returnable steel reels
SpecialDistrict · CA, US
From the first pre-RFP signals to the published RFP and its files.
Capital improvement plan
LADWP's 2025-26 Power System Reliability Program proposes replacing 60 miles of underground cable.
Infrastructure Replacement 2024-25 Achievements 2025-26 Goals Poles 2,743 4,000 Crossarms 10,642 13,900 Transformers 1,611 1,407 Underground Cable (Miles) 59.9 60
Los Angeles Department of Water and Power Power Infrastructure Plan 2025-2026
Capital improvement plan · 2025
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (24 days left)
Decision makers connected to this RFP from Los Angeles Department of Water and Power.
Adjacent opportunities open for bidding right now.
U.S. Army Engineer District Norfolk
FederalVA
Posted
Sep 18, 2026
Nov 23, 2026
Dredging approx. 550,000 CY of maintenance material.
Southern Sandoval County Arroyo Flood Control Authority
Special DistrictNM
Posted
Oct 1, 2026
Nov 10, 2026
Construction Services for the Lisbon Channel Improvements Phase 3.
CountyIA
Posted
Oct 14, 2026
Nov 17, 2026
Procurement of services for the replacement of a 100'-0" x 30'-0" continuous concrete slab bridge on St. Joe's Prairie Road over Lytle Creek.
CountyCA
Posted
Oct 7, 2026
Nov 5, 2026
Work consists of removal, disposal, and replacement of approx 117 LF of reinforced concrete (RC) channel. It also includes the installation of 24 sections of 10' wide x 7' high x 4' long RC Precast Box with subdrain system, approx 21 LF of cast in place RC channel transitions, the construction of approx 227 SY of 6" thick crushed miscellaneous base (CMB) access road, and the installation of 260 LF of chain link fence and gates.