Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Mobilization; 500 sf work zone signs (stationary); 814 sf work zone signs (portable); 64 sf work zone signs (barricade mounted); 6 ea flashing arrow board; 14 ea portable changeable message sign; 212 ea drums; 72 lf barricades (type iii); 4 ea tma; 2 ea generic traffic control item connected lane closure system; 52 ea generic traffic control item sequential flashing warning lights; lump sum ls portable lighting; structure items; 270 lf generic structure item replacement of foam joint seals; 84 ea generic structure item elastomeric bearing; 6 ea generic structure item. See attached file for full scope.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 316' bridge preservation project.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Work includes 316' bridge preservation project.
AvailableBridge Preservation of 10 Bridges Carrying I-95.
Posted Date
Jan 4, 2026
Due Date
Feb 24, 2026
Release: Jan 4, 2026
Close: Feb 24, 2026
Bridge Preservation of 10 Bridges Carrying I-95.
AvailableWork includes bridge preservation.
Posted Date
Jan 23, 2026
Due Date
Feb 26, 2026
Release: Jan 23, 2026
Close: Feb 26, 2026
Work includes bridge preservation.
AvailableWork consists of removing existing deck surfaces by mechanical milling and applying polyester polymer concrete (ppc) overlay. The project also includes replacing pavement markings, guardrail and other miscellaneous work. Work includes, 1,345 LF of removal of embankment curb; 1,663 LF of remove guard rail; 432 SY of remove bridge deck surface (mechanical milling); 360 SY of grading roadway for pavement; 180 TON of asphaltic concrete (miscellaneous structural) (special mix); 432 SY of bridge repair (ppc bridge deck overlay); 2,800 LF of temporary concrete barrier (installation and removal); 503 LF of waterborne-type i pavement marking (painted (white); 1,563 LF of guard rail, w-beam, single face (mash). See attached files.
Posted Date
Nov 17, 2025
Due Date
Feb 20, 2026
Release: Nov 17, 2025
Close: Feb 20, 2026
Work consists of removing existing deck surfaces by mechanical milling and applying polyester polymer concrete (ppc) overlay. The project also includes replacing pavement markings, guardrail and other miscellaneous work. Work includes, 1,345 LF of removal of embankment curb; 1,663 LF of remove guard rail; 432 SY of remove bridge deck surface (mechanical milling); 360 SY of grading roadway for pavement; 180 TON of asphaltic concrete (miscellaneous structural) (special mix); 432 SY of bridge repair (ppc bridge deck overlay); 2,800 LF of temporary concrete barrier (installation and removal); 503 LF of waterborne-type i pavement marking (painted (white); 1,563 LF of guard rail, w-beam, single face (mash). See attached files.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis