Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 316' bridge preservation project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes: 82 CY, class 1 excavation; 29 CY, class 4 excavation; 20 TN, Selected borrow excavation rock, class R-4; 41 TN, selected borrow excavation rock, class R-4 (includes excavation); 245 SY, superpave asphalt mixture design, base course, pg 64s-22, <0.3 million ESALS, 25. 0 mm mix, 4" depth; 245 SY, asphalt tack coat (TT/NCTT); 66 LF, remove existing guide rail (contractor's property); 12.5 LF, Type 31-S guide rail; 78 SY, Protective coating for reinforced concrete surfaces (penetrating sealers) (100% silane); 15 LF, 6" structure foundation drain (PVC pipe, schedule 40); 157 LB, 4x4 epoxy coated steel WWF w4 x w4. See attached files.
Posted Date
Jan 17, 2026
Due Date
Feb 12, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 12, 2026
Work includes: 82 CY, class 1 excavation; 29 CY, class 4 excavation; 20 TN, Selected borrow excavation rock, class R-4; 41 TN, selected borrow excavation rock, class R-4 (includes excavation); 245 SY, superpave asphalt mixture design, base course, pg 64s-22, <0.3 million ESALS, 25. 0 mm mix, 4" depth; 245 SY, asphalt tack coat (TT/NCTT); 66 LF, remove existing guide rail (contractor's property); 12.5 LF, Type 31-S guide rail; 78 SY, Protective coating for reinforced concrete surfaces (penetrating sealers) (100% silane); 15 LF, 6" structure foundation drain (PVC pipe, schedule 40); 157 LB, 4x4 epoxy coated steel WWF w4 x w4. See attached files.
AvailableBridge Preservation of 10 Bridges Carrying I-95.
Posted Date
Jan 4, 2026
Due Date
Feb 24, 2026
Release: Jan 4, 2026
Close: Feb 24, 2026
Bridge Preservation of 10 Bridges Carrying I-95.
AvailableWork includes bridge preservation.
Posted Date
Jan 23, 2026
Due Date
Feb 26, 2026
Release: Jan 23, 2026
Close: Feb 26, 2026
Work includes bridge preservation.
AvailableConstruction of: multi-bridge replacement project.
Posted Date
Jan 24, 2026
Due Date
Feb 17, 2026
Release: Jan 24, 2026
Close: Feb 17, 2026
Construction of: multi-bridge replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →