Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes: 82 CY, class 1 excavation; 29 CY, class 4 excavation; 20 TN, Selected borrow excavation rock, class R-4; 41 TN, selected borrow excavation rock, class R-4 (includes excavation); 245 SY, superpave asphalt mixture design, base course, pg 64s-22, <0.3 million ESALS, 25. 0 mm mix, 4" depth; 245 SY, asphalt tack coat (TT/NCTT); 66 LF, remove existing guide rail (contractor's property); 12.5 LF, Type 31-S guide rail; 78 SY, Protective coating for reinforced concrete surfaces (penetrating sealers) (100% silane); 15 LF, 6" structure foundation drain (PVC pipe, schedule 40); 157 LB, 4x4 epoxy coated steel WWF w4 x w4. See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 316' bridge preservation project.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Work includes 316' bridge preservation project.
AvailableProvide bridge maintenance project.
Posted Date
Feb 2, 2026
Due Date
Feb 26, 2026
Release: Feb 2, 2026
Close: Feb 26, 2026
Provide bridge maintenance project.
AvailableThe County of Sacramento is soliciting sealed bids for the Freeport Bridge Deck Repair Project to furnish all labor, materials, and equipment for bridge maintenance in conformance with project specifications. The contract requires completion within thirty working days and adherence to Sacramento County and Caltrans standards. Bids are due by February 26, 2026, for this active construction procurement.
Posted Date
Jan 29, 2026
Due Date
Feb 26, 2026
Release: Jan 29, 2026
Close: Feb 26, 2026
The County of Sacramento is soliciting sealed bids for the Freeport Bridge Deck Repair Project to furnish all labor, materials, and equipment for bridge maintenance in conformance with project specifications. The contract requires completion within thirty working days and adherence to Sacramento County and Caltrans standards. Bids are due by February 26, 2026, for this active construction procurement.
AvailableConstruction of: multi-bridge replacement project.
Posted Date
Jan 24, 2026
Due Date
Feb 17, 2026
Release: Jan 24, 2026
Close: Feb 17, 2026
Construction of: multi-bridge replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis