FederalDC
Posted
Aug 20, 2026
Nov 1, 2026
Description: The Department of the Air Force is conducting market research to identify sources capable of manufacturing crashworthy seat kits for C-130J aircraft. The requirement covers 86 C-130J Loadmaster Crashworthy Seat kits, including 51 Group A kits and 35 Group B kits, plus fabrication, inspection, testing, packaging, delivery, engineering, installation, and technical documentation support. This active Sources Sought notice is a request for information rather than a grant program, with responses due Sep 22, 2026 at 4:00 PM EDT.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from Department of the Air Force.
Adjacent opportunities open for bidding right now.
FederalDC
Posted
Aug 20, 2026
Nov 1, 2026
2 ea, pilot seat, NSN: 1680-01-HS1-3140, P/N: 108000-3.
CountyTX
Posted
Sep 8, 2026
Oct 15, 2026
Provide reconstruction of west county road. 1,131 LF sawcut existing asphalt and concrete (full depth); 923 CY asphalt excavation - 1.0 inch depth (average); 923 CY asphalt haul off; 14,786 CY earthwork; 14,786 CY haul off; 43,064 SY subgrade preparation (roadway). See attached file.
FederalOK
Posted
Sep 9, 2026
Sep 24, 2026
This Sources Sought RFI seeks market information from potential sources able to qualify and repair C-5 Moving Island Actuators for U.S. Air Force use. The requirement covers eight listed NSNs, which are critical components of the C-5 slat system, and may require special tooling for repair and overhaul. Responses were due September 24, 2026 at 5:30 p.m. EDT; the notice was active on September 15, 2026 and states that participation is voluntary and unreimbursed.
Naval Surface Warfare Center (NSWC)
FederalDC
Posted
Sep 11, 2026
Sep 30, 2026
Provide handheld gas analyzers. Provide highly portable, self-contained units weighing under 5 lbs that can be deployed in under 3 minutes and simultaneously detects/monitor O2, LEL, CO, H2S, VOC. Furthermore, to minimize shipboard maintenance footprints, the ideal solution must support an extended calibration-free interval of at least 12 months and feature a simplified, rapid field-sensor replacement process. See attached file.