Retrieving RFP details
Release
Close
City of Waco
Project generally consists of the expansion of the existing bull hide wastewater treatment facility to 4.0 mgd adf and 16.0 mgd p2hf, including construction of a new influent pump station, headworks to screen and degrit, flow distribution structure, process trains c and d, mixed liquor splitter box, secondary clarifiers c and d, disk filter, UV disinfection equipment (replace existing outdated equipment), solids storage and thickening facilities, odor control systems, alum feed facility, electrical and blower buildings/enclosures, and site civil piping, grading and drainage improvements.
City of Greenville
Provide 18 mgd wastewater treatment plant expansion - demolition contract.
Harris County Mud 495
Wastewater Treatment Plant No. 1 Phase 5 (1.50 MGD).
City of Waycross
Wastewater Treatment Facility Upgrades – Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
Release
Aug 11, 2025
Close
Nov 21, 2025