Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide bulk chemical commodities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replace the main generator at the Columbia Generating Station, nuclear power generating facility with a boiling water reactor, 1,200-megfawatt electric generation unit, during refuel outage 30.
Posted Date
Nov 12, 2025
Due Date
Feb 5, 2026
Release: Nov 12, 2025
Close: Feb 5, 2026
Replace the main generator at the Columbia Generating Station, nuclear power generating facility with a boiling water reactor, 1,200-megfawatt electric generation unit, during refuel outage 30.
AvailablePremium
Access the largest public sector contact database
The solicitation requests contracting a company to manufacture a new catalyst for the existing Selective Catalytic Reduction (SCR) system at the Brandy Branch Generating Station (units B52-B53). The work requires contractor mobilization to the site to remove and dispose of the existing SCR catalyst and install the new catalyst. The procurement is being posted by JEA and documentation is available on JEA's procurement opportunities page.
Posted Date
Nov 22, 2025
Due Date
Dec 16, 2026
Release: Nov 22, 2025
Close: Dec 16, 2026
The solicitation requests contracting a company to manufacture a new catalyst for the existing Selective Catalytic Reduction (SCR) system at the Brandy Branch Generating Station (units B52-B53). The work requires contractor mobilization to the site to remove and dispose of the existing SCR catalyst and install the new catalyst. The procurement is being posted by JEA and documentation is available on JEA's procurement opportunities page.
AvailableThe work consists of providing the necessary labor, materials, equipment, supervision, and plant for the construction of the wastewater treatment plant improvements, onsite lift station improvements, and liquid chemical conversion including but not limited to: lift station pump replacement and structural modifications; main process basins piping improvements; liquid chemical feed equipment, piping, CMU building with metal canopy chemical storage area; electrical; controls; demolition items; pavement; site grading and drainage; and site restoration as specified.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
The work consists of providing the necessary labor, materials, equipment, supervision, and plant for the construction of the wastewater treatment plant improvements, onsite lift station improvements, and liquid chemical conversion including but not limited to: lift station pump replacement and structural modifications; main process basins piping improvements; liquid chemical feed equipment, piping, CMU building with metal canopy chemical storage area; electrical; controls; demolition items; pavement; site grading and drainage; and site restoration as specified.
AvailableBulk Storage Incentive program provides financial support for new energy storage systems over 5 megawatts (MW) of power measured in alternating current (AC) that provide wholesale market energy, ancillary services, and/or capacity services. Systems may be interconnected at the transmission, sub-transmission, or distribution level and may provide distribution services in addition to wholesale services. Incentive funds will be deployed through a administered declining incentive.
Posted Date
Apr 19, 2021
Due Date
Dec 31, 2025
Release: Apr 19, 2021
Close: Dec 31, 2025
Bulk Storage Incentive program provides financial support for new energy storage systems over 5 megawatts (MW) of power measured in alternating current (AC) that provide wholesale market energy, ancillary services, and/or capacity services. Systems may be interconnected at the transmission, sub-transmission, or distribution level and may provide distribution services in addition to wholesale services. Incentive funds will be deployed through a administered declining incentive.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis