Summary
Work includes installation of traffic coating, level 5.0 to level 6.0, repair of column cracks, epoxy injection 100 SF, repair of concrete beam, partial depth 320 SF, repair of concrete columns and panels, partial depth 120 SF, repair of concrete deck topside including sog, partial depth 288 SF, repair of concrete deck underside 195 SF, repair of concrete, full depth 50 SF, repair of beam cracks, chemical grout 390 LF, repair of beam cracks, epoxy injection 1120 LF, repair of slab crack repairs 5000 LF, repair of precast panel connection, bridge repair, replacement of protective covering of barrier cables (level 5.0 to 6.0). See attached file.