VAMC Central Western MA Bldg. 65 Electrical Switch Repair
After award, but prior to the start of any field work, the contractor shall contact the Project Engineer/Manager (i.e. COR) to review proposed methods and plans for completion of work and to review infection control procedures, interim life safety procedures, and hot permits, schedule and shutdown requirements. Please review all documents prior to this meeting. The contractor is responsible for shutting down, making safe, LOTO, and testing all energized parts IAW NFPA 70E. Some off-hours may be required. The scope of this work is to furnish and install all new porcelain insulators and new stainless-steel hardware within switch 1 (SW1). Furnish and install one new S&C fuse holder assembly. Clean and lubricate all mechanisms within the switch (2 sets of 3) IAW NFPA 70B and the manufacturers recommended service. See attached file.