Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform various/different sewer patrol point modifications and provide materials, services and trucking as needed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Irrigation Piping involving irrigation system, aggregate surfacing, asphalt paving, fencing, grading and traffic control work on US 16 beginning at RM 27.90 between and Buffalo.
Posted Date
Sep 17, 2024
Due Date
Mar 31, 2026
Release: Sep 17, 2024
Close: Mar 31, 2026
Irrigation Piping involving irrigation system, aggregate surfacing, asphalt paving, fencing, grading and traffic control work on US 16 beginning at RM 27.90 between and Buffalo.
AvailablePremium
Access the largest public sector contact database
Rehabilitation project for Curry Ln. and Buffalo Gap Rd.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
Rehabilitation project for Curry Ln. and Buffalo Gap Rd.
AvailableThe City of Abilene, Texas is soliciting bids for the Curry Ln. and Buffalo Gap Rd. Rehabilitation Project to remove and replace pavement at the intersection, construct a concrete street apron, replace HMAC in the surrounding area, and update pavement markings. The work is to be completed within thirty (30) consecutive working days from Notice to Proceed and requires bidders to meet the City of Abilene’s insurance and debarment requirements. The project location is the intersection of Curry Ln. and Buffalo Gap Rd., Abilene, Texas, with an estimated value range of $500,000 - $1,500,000 (AI estimate).
Posted Date
Dec 5, 2025
Due Date
Dec 23, 2025
Release: Dec 5, 2025
Close: Dec 23, 2025
The City of Abilene, Texas is soliciting bids for the Curry Ln. and Buffalo Gap Rd. Rehabilitation Project to remove and replace pavement at the intersection, construct a concrete street apron, replace HMAC in the surrounding area, and update pavement markings. The work is to be completed within thirty (30) consecutive working days from Notice to Proceed and requires bidders to meet the City of Abilene’s insurance and debarment requirements. The project location is the intersection of Curry Ln. and Buffalo Gap Rd., Abilene, Texas, with an estimated value range of $500,000 - $1,500,000 (AI estimate).
AvailableThe Perry Township Municipal Authority (Snyder County, PA) requests bids for the 2025-WW1 Sewer Collection and Pump Stations project, which includes construction of approximately 8,200 linear feet of 6", 8", and 12" gravity sewer lines, two submersible wastewater pump stations, ~900 LF of wastewater force mains and ~675 LF of a 6" waterline extension with appurtenances. The procurement is posted as an IFB on the PennBid (Bonfire) portal with an estimated contract value of $2,315,000 and requires submission of bidding documents, bonded bid and specified certifications. Bids are submitted through the Bonfire portal; several bid documents and an Addendum #1 are posted on the Bonfire opportunity (download requires Bonfire login).
Posted Date
Nov 24, 2025
Due Date
Jan 7, 2026
Release: Nov 24, 2025
Close: Jan 7, 2026
The Perry Township Municipal Authority (Snyder County, PA) requests bids for the 2025-WW1 Sewer Collection and Pump Stations project, which includes construction of approximately 8,200 linear feet of 6", 8", and 12" gravity sewer lines, two submersible wastewater pump stations, ~900 LF of wastewater force mains and ~675 LF of a 6" waterline extension with appurtenances. The procurement is posted as an IFB on the PennBid (Bonfire) portal with an estimated contract value of $2,315,000 and requires submission of bidding documents, bonded bid and specified certifications. Bids are submitted through the Bonfire portal; several bid documents and an Addendum #1 are posted on the Bonfire opportunity (download requires Bonfire login).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis