Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
WOrk consists of removal of the Buena Park Linden well pump and motor, installation of owner supplied packers and associated equipment, reinstallation of the existing well pump and motor, and assist with performing pumping tests to measure flow and PFAS concentrations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking qualified contractors to install a pitless adapter and a liner (K-Packer) repair on Well #27.
Posted Date
-
Due Date
Feb 4, 2026
Close: Feb 4, 2026
Seeking qualified contractors to install a pitless adapter and a liner (K-Packer) repair on Well #27.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Landfill vertical well installation (phase ii).
Posted Date
Dec 22, 2025
Due Date
Jan 30, 2026
Release: Dec 22, 2025
Close: Jan 30, 2026
Landfill vertical well installation (phase ii).
AvailableThe Project consists of site preparation and installation of a corrosion-proof polymer concrete precast wet well using the caisson method with tremie pour for the bottom seal. The scope includes clearing and grubbing the site, installing erosion and sedimentation controls, excavating for the wet well shaft, assembling and sealing wet well sections with retainer straps and watertight joints, pouring the tremie seal concrete, installing the secondary pour for the wet well bottom with chamfered edges, and conducting buoyancy calculations, watertightness testing, and backfilling.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
The Project consists of site preparation and installation of a corrosion-proof polymer concrete precast wet well using the caisson method with tremie pour for the bottom seal. The scope includes clearing and grubbing the site, installing erosion and sedimentation controls, excavating for the wet well shaft, assembling and sealing wet well sections with retainer straps and watertight joints, pouring the tremie seal concrete, installing the secondary pour for the wet well bottom with chamfered edges, and conducting buoyancy calculations, watertightness testing, and backfilling.
AvailableWell #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Well #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →