Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of iron filter replacement in water treatment plant. 1 LS WTP & well improvements; 1 LS filter improvements; 1 LS backwash waste tank rehabilitation; 1 LS owner's allowance.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Town of Orange issued a PPEA solicitation for the rehabilitation of its Water Treatment Plant filter system, including the replacement of granular filter media and repair of underdrains. The project involves structural and process improvements to filtration units to meet Virginia Department of Health standards. The estimated value of the project ranges from $500,000 to $1,500,000 with a response deadline in April 2026.
Posted Date
Jan 23, 2026
Due Date
Apr 22, 2026
Release: Jan 23, 2026
Close: Apr 22, 2026
The Town of Orange issued a PPEA solicitation for the rehabilitation of its Water Treatment Plant filter system, including the replacement of granular filter media and repair of underdrains. The project involves structural and process improvements to filtration units to meet Virginia Department of Health standards. The estimated value of the project ranges from $500,000 to $1,500,000 with a response deadline in April 2026.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform inspection services during the reservoir 1 water treatment plant filter valve replacement project.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Perform inspection services during the reservoir 1 water treatment plant filter valve replacement project.
AvailableWork consists of: demolition of existing Filter Control Building, filter valves, operators, electircal conduit, wire, PLC and SCADA systems, and installation of a new Filter Control Building, UPS Shed, Filter Valves, bridge crane system, PLC, UPS, and SCADA systems, and extensive electrical conduit and wire modifications at the Reservoir 1 Water Treatment Plant. Work includes structural concrete, wood structures, mechanical valves and piping, electrical equipment, conduit, wiring, and PLC and SCADA systems and other modifications.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
Work consists of: demolition of existing Filter Control Building, filter valves, operators, electircal conduit, wire, PLC and SCADA systems, and installation of a new Filter Control Building, UPS Shed, Filter Valves, bridge crane system, PLC, UPS, and SCADA systems, and extensive electrical conduit and wire modifications at the Reservoir 1 Water Treatment Plant. Work includes structural concrete, wood structures, mechanical valves and piping, electrical equipment, conduit, wiring, and PLC and SCADA systems and other modifications.
AvailableImprovements to the Water Treatment Plant (WTP) for the Borough.
Posted Date
Nov 24, 2025
Due Date
Jan 27, 2026
Release: Nov 24, 2025
Close: Jan 27, 2026
Improvements to the Water Treatment Plant (WTP) for the Borough.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →