Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes restoration of approximately 1,800 LF of brush run and a stream crossing relocation of approximately 150 LF of 8 water main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of the reconnection of a historic side channel, improving the connectivity to the floodplain while increasing critical flood refuge and salmonid-rearing habitat along the cedar river. The project will also include partially removing an existing revetment and constructing a new revetment end treatment extending off the remaining upstream portion of the rutledge johnson facility that is being left in place. The work required to complete this project includes installing and maintaining temporary erosion and sediment control facilities; providing temporary traffic control; removing noxious weeds; clearing; removing trash and miscellaneous abandoned infrastructure from the site; tree salvage; installing and maintaining temporary facilities; excavation and haul; grading; riprap removal; soil decompaction and amendment; placing and anchoring large woody debris; installing vertical buried log piles and perch poles; and installing a riprap revetment end treatment.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 13, 2026
Project consists of the reconnection of a historic side channel, improving the connectivity to the floodplain while increasing critical flood refuge and salmonid-rearing habitat along the cedar river. The project will also include partially removing an existing revetment and constructing a new revetment end treatment extending off the remaining upstream portion of the rutledge johnson facility that is being left in place. The work required to complete this project includes installing and maintaining temporary erosion and sediment control facilities; providing temporary traffic control; removing noxious weeds; clearing; removing trash and miscellaneous abandoned infrastructure from the site; tree salvage; installing and maintaining temporary facilities; excavation and haul; grading; riprap removal; soil decompaction and amendment; placing and anchoring large woody debris; installing vertical buried log piles and perch poles; and installing a riprap revetment end treatment.
AvailableBend Park and Recreation District invites bids from general contractors for the Sylvan Park Improvements Project. Bids are due January 15, 2026 at 2:00 PM Pacific Time and will be received at the District office in Bend, Oregon. The notice specifies a mandatory pre‑bid conference on December 23, 2025 and directs bidders to Premier Builders Exchange for bid documents, confirming this is a public works construction solicitation (not a grant).
Posted Date
-
Due Date
Jan 15, 2026
Release: -
Close: Jan 15, 2026
Bend Park and Recreation District invites bids from general contractors for the Sylvan Park Improvements Project. Bids are due January 15, 2026 at 2:00 PM Pacific Time and will be received at the District office in Bend, Oregon. The notice specifies a mandatory pre‑bid conference on December 23, 2025 and directs bidders to Premier Builders Exchange for bid documents, confirming this is a public works construction solicitation (not a grant).
AvailableWork includes 1875 LF of stream restoration including excavation, grading, slope stabilization fabric, erosion and sedimentation controls, landscape restoration, vegetated coir log, riparian buffer plants, replacement of existing retaining wall, and all necessary appurtenances and restoration for said construction.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
Work includes 1875 LF of stream restoration including excavation, grading, slope stabilization fabric, erosion and sedimentation controls, landscape restoration, vegetated coir log, riparian buffer plants, replacement of existing retaining wall, and all necessary appurtenances and restoration for said construction.
AvailableWindow restoration project.
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
Window restoration project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →