Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of the reconnection of a historic side channel, improving the connectivity to the floodplain while increasing critical flood refuge and salmonid-rearing habitat along the cedar river. The project will also include partially removing an existing revetment and constructing a new revetment end treatment extending off the remaining upstream portion of the rutledge johnson facility that is being left in place. The work required to complete this project includes installing and maintaining temporary erosion and sediment control facilities; providing temporary traffic control; removing noxious weeds; clearing; removing trash and miscellaneous abandoned infrastructure from the site; tree salvage; installing and maintaining temporary facilities; excavation and haul; grading; riprap removal; soil decompaction and amendment; placing and anchoring large woody debris; installing vertical buried log piles and perch poles; and installing a riprap revetment end treatment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Lumberton seeks design, engineering, and permitting services for the Lumberton Loop Meadow Branch Floodplain Restoration Project. The project aims to restore stream channels, construct wetlands, and reforest floodplains to reduce flood losses and enhance park access. The budget is $385,000, and the project involves collaboration with NC State University Coastal Dynamics Design Lab.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
The City of Lumberton seeks design, engineering, and permitting services for the Lumberton Loop Meadow Branch Floodplain Restoration Project. The project aims to restore stream channels, construct wetlands, and reforest floodplains to reduce flood losses and enhance park access. The budget is $385,000, and the project involves collaboration with NC State University Coastal Dynamics Design Lab.
AvailableConstruction quality assurance for the Johnson Canyon landfill module 8 construction project.
Posted Date
Nov 12, 2025
Due Date
Jan 8, 2026
Release: Nov 12, 2025
Close: Jan 8, 2026
Construction quality assurance for the Johnson Canyon landfill module 8 construction project.
AvailableThe State of Vermont seeks professional services to develop final design documents for the Black Falls Brook Floodplain Restoration project in Montgomery, VT, including excavation of approximately 4.5 acres, an estimated 29,000 cubic yards of sediment removal, scour and embankment stabilization, and coordination with VTrans. The solicitation was posted on 2025-11-18 and proposals are due 2025-12-19 at 10:00 PM (recorded as 2025-12-19T22:00:00Z).
Posted Date
Nov 18, 2025
Due Date
Dec 19, 2025
Release: Nov 18, 2025
Close: Dec 19, 2025
The State of Vermont seeks professional services to develop final design documents for the Black Falls Brook Floodplain Restoration project in Montgomery, VT, including excavation of approximately 4.5 acres, an estimated 29,000 cubic yards of sediment removal, scour and embankment stabilization, and coordination with VTrans. The solicitation was posted on 2025-11-18 and proposals are due 2025-12-19 at 10:00 PM (recorded as 2025-12-19T22:00:00Z).
Franklin County Natural Resources Conservation District seeks engineering consultants to deliver final design for a floodplain restoration at the confluence of Black Falls Brook and the Trout River in Montgomery, Vermont. Scope includes floodplain lowering (~4.5 acres), significant sediment removal, embankment stabilization, bridge scour protection, and coordination with VTrans; proposals are due December 19, 2025 at 5:00 PM EST.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Franklin County Natural Resources Conservation District seeks engineering consultants to deliver final design for a floodplain restoration at the confluence of Black Falls Brook and the Trout River in Montgomery, Vermont. Scope includes floodplain lowering (~4.5 acres), significant sediment removal, embankment stabilization, bridge scour protection, and coordination with VTrans; proposals are due December 19, 2025 at 5:00 PM EST.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis