Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The State of Vermont seeks professional services to develop final design documents for the Black Falls Brook Floodplain Restoration project in Montgomery, VT, including excavation of approximately 4.5 acres, an estimated 29,000 cubic yards of sediment removal, scour and embankment stabilization, and coordination with VTrans. The solicitation was posted on 2025-11-18 and proposals are due 2025-12-19 at 10:00 PM (recorded as 2025-12-19T22:00:00Z).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Franklin County Natural Resources Conservation District seeks engineering consultants to deliver final design for a floodplain restoration at the confluence of Black Falls Brook and the Trout River in Montgomery, Vermont. Scope includes floodplain lowering (~4.5 acres), significant sediment removal, embankment stabilization, bridge scour protection, and coordination with VTrans; proposals are due December 19, 2025 at 5:00 PM EST.
Posted Date
-
Due Date
Dec 19, 2025
Premium
Access the largest public sector contact database
Franklin County Natural Resources Conservation District seeks engineering consultants to deliver final design for a floodplain restoration at the confluence of Black Falls Brook and the Trout River in Montgomery, Vermont. Scope includes floodplain lowering (~4.5 acres), significant sediment removal, embankment stabilization, bridge scour protection, and coordination with VTrans; proposals are due December 19, 2025 at 5:00 PM EST.
The City of Lumberton seeks design, engineering, and permitting services for the Lumberton Loop Meadow Branch Floodplain Restoration Project. The project aims to restore stream channels, construct wetlands, and reforest floodplains to reduce flood losses and enhance park access. The budget is $385,000, and the project involves collaboration with NC State University Coastal Dynamics Design Lab.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
The City of Lumberton seeks design, engineering, and permitting services for the Lumberton Loop Meadow Branch Floodplain Restoration Project. The project aims to restore stream channels, construct wetlands, and reforest floodplains to reduce flood losses and enhance park access. The budget is $385,000, and the project involves collaboration with NC State University Coastal Dynamics Design Lab.
AvailableTo provide engineering design services. December 16, 2025 12:00 NN
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
To provide engineering design services. December 16, 2025 12:00 NN
AvailableChase Brook Park restoration and pedestrian bridge project. Removal of brick walk way, trees, vegetation, installation of timber piles for pedestrian bridge, construction of pedestrian bridge, vegetative planting, coir logs for bank stabilization, site grading park walkways, installation of benches, picnic tables, & more
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Close: Dec 19, 2025
Chase Brook Park restoration and pedestrian bridge project. Removal of brick walk way, trees, vegetation, installation of timber piles for pedestrian bridge, construction of pedestrian bridge, vegetative planting, coir logs for bank stabilization, site grading park walkways, installation of benches, picnic tables, & more
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis