Fire DepartmentME
Posted
Nov 10, 2026
Dec 10, 2026
Brunswick Perimeter Trail Phase 1 Located at Brunswick Landing RFP
The Town of Brunswick is soliciting a qualified trail construction contractor to build a ten-foot-wide perimeter trail with two-foot shoulders through a mix of forest, wetlands, hills, and riparian areas at Brunswick Landing. The alignment and preferred corridor were identified by a Perimeter Trail committee in coordination with major landowners, including Flycatcher LLC and OBP Trailworks LLC, and the selected contractor will be required to construct the corridor as specified. Prospective builders are invited to submit all required work components and supporting documents as outlined in the Request for Proposals.
