Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking bids from qualified contractors to repair damage to the historic Browns River Covered Bridge. Work to be Performed: Structural Repairs: Burr Arches: Remove and replace the rotted end sections of the exterior Burr arches at all four corners of the bridge. Jack up both ends of the bridge to relieve pressure on the rotted bearing blocks and bolster beams. o Bolster Beams: Remove and replace the two rotted bolster beams. Extend the replacement beams to cover a full 24 FT length. Bearing Blocks: Remove and replace all rotted bearing blocks under the bridge. West Portal Joist: Pull up the decking and replace the rotted first joist at the west portal with a new white oak timber. 2. Flashing and Sheathing: Flashing: Remove and replace the faulty flashing at all four corners to protect structural components. Sheathing: Replace the sheathing at the corners to fully cover and protect the bolster beams. Ensure new sheathing extends 24 FT to fully cover bolster beams and prevent water infiltration. 3. Protective Measures: Wood Treatment: Utilize protective measures to protect the wood elements from moisture and the elements. Use No. 1 and better white oak for all timber replacements (arches, bolster beams, bearing blocks, and joists). Parapet Flashing: Install new flashing atop the new joists to prevent water infiltration and protect against windblown rain.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Maintenance and Rehabilitation of Kutz Mill Covered Bridge #46E and Greenawalt Bridge #32A.
Posted Date
Nov 24, 2025
Due Date
Jan 15, 2026
Release: Nov 24, 2025
Close: Jan 15, 2026
Maintenance and Rehabilitation of Kutz Mill Covered Bridge #46E and Greenawalt Bridge #32A.
AvailableWork includes covered bridge road water main extension project.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Work includes covered bridge road water main extension project.
Concrete and steel repairs for the tacony-palmyra bridge.
Posted Date
Nov 21, 2025
Due Date
Jan 6, 2026
Release: Nov 21, 2025
Close: Jan 6, 2026
Concrete and steel repairs for the tacony-palmyra bridge.
AvailableThe Project includes the following Work: Onion River Road, Bridge 27 – Install temporary bypass road, remove temporary bridge, demolish old bridge, installation of new bridge (95’ clear span, NEDBT40 precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction and associated work. Sass Ave, Bridge 17 – Demolish old bridge, installation of new bridge (75’ clear span, NEXT36D precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated work.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Close: Dec 19, 2025
The Project includes the following Work: Onion River Road, Bridge 27 – Install temporary bypass road, remove temporary bridge, demolish old bridge, installation of new bridge (95’ clear span, NEDBT40 precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction and associated work. Sass Ave, Bridge 17 – Demolish old bridge, installation of new bridge (75’ clear span, NEXT36D precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated work.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis