Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Roof replacement services - include, but are not limited to, removal of roofing down to the concrete deck, installation of vapor barrier as temporary roof, mount new tapered insulation, including cover board, installation of Fibertite 36 Mil KEE membrane roofing system, installation of flashings and accessories, and drainage installation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Jan 6, 2026
Close: Feb 6, 2026
Roof replacement.
AvailableReplacement of the roof at the Oneida County Health and ADRC facility.
Posted Date
Dec 2, 2025
Due Date
Jan 30, 2026
Release: Dec 2, 2025
Close: Jan 30, 2026
Replacement of the roof at the Oneida County Health and ADRC facility.
AvailableProcurement of roof replacement services for Wea Ridge Middle School.
Posted Date
-
Due Date
Jan 23, 2026
Release: -
Close: Jan 23, 2026
Procurement of roof replacement services for Wea Ridge Middle School.
AvailableRemove existing epdm roof and insulation down to the original gravel built up roof and remove flashings and metal trim. Installation of a 20 year - 060 mil white tpo membrane roof. Install 1.5" iso insulation cover board and then mechanically attach a 060-mil white tpo membrane roof system. Wall flashings are to go up and over the parapet walls and terminate with a standard metal gravel stop detail. All sheet metal flashing and trim shall be shop fabricated from 24 ga kynar coated flat sheets. Install new gravel stop, drip edge, gutter, downspout, counter flashing, penetration boots, and splice plates. Provide a 20-year ndl warranty. See outside link.
Posted Date
Nov 26, 2025
Due Date
Jan 9, 2026
Release: Nov 26, 2025
Close: Jan 9, 2026
Remove existing epdm roof and insulation down to the original gravel built up roof and remove flashings and metal trim. Installation of a 20 year - 060 mil white tpo membrane roof. Install 1.5" iso insulation cover board and then mechanically attach a 060-mil white tpo membrane roof system. Wall flashings are to go up and over the parapet walls and terminate with a standard metal gravel stop detail. All sheet metal flashing and trim shall be shop fabricated from 24 ga kynar coated flat sheets. Install new gravel stop, drip edge, gutter, downspout, counter flashing, penetration boots, and splice plates. Provide a 20-year ndl warranty. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis