Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consist of approx 412.22 CY class 20 excavation; 600 LF 10" steel pile; 880 LF 12" steel pile; 100 LF silt fence; 282.70 CY structural concrete.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes : 412.22 CY excavation class 20; 600 LF pile, steel h, 10"; 100 LF silt fence; 292.70 CY structural concrete; see attached file.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Work includes : 412.22 CY excavation class 20; 600 LF pile, steel h, 10"; 100 LF silt fence; 292.70 CY structural concrete; see attached file.
AvailablePremium
Access the largest public sector contact database
The project will improve safety and traffic flow by replacing the Interstate 81 bridge over Matson Drive and extend the I-81 northbound off ramp at exit 45 in the Marion area of Smyth County. This project is part of the Interstate 81 Corridor Improvement Program (CIP), which aims to improve safety, increase reliability and foster economic growth. The I-81 CIP encompasses 65 capital projects and numerous operational improvements spanning the 325-mile corridor of the interstate in Virginia.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
The project will improve safety and traffic flow by replacing the Interstate 81 bridge over Matson Drive and extend the I-81 northbound off ramp at exit 45 in the Marion area of Smyth County. This project is part of the Interstate 81 Corridor Improvement Program (CIP), which aims to improve safety, increase reliability and foster economic growth. The I-81 CIP encompasses 65 capital projects and numerous operational improvements spanning the 325-mile corridor of the interstate in Virginia.
Replacement of Bridge
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Replacement of Bridge
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis