Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Improve pedestrian safety and accessibility along the length of the project including, but not limited to, ADA ramp replacement, sidewalk repair/replacement, site features such as curbs, walls and paving, storm drainage, stormwater management and the relocation of impacted utilities and signs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes sidewalk revision.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
Work includes sidewalk revision.
AvailableProvide sidewalk repairs. The sidewalk repair sections will be twenty feet or less in length. Each sidewalk repair area is marked with white paint. The scope of work for the sidewalk repairs shall be to saw cut the area, remove existing sidewalk, set forms, rebar, dowels, expansion joints as needed, place and finish new concrete sidewalk. Rebar shall be #3 bars on 16" centers, both ways. Concrete shall be a minimum of 5 sack cement per yard, limestone gravel, 3,000 psi ready mix concrete. Expansion joints shall be redwood or treated wood for ground contact.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
Provide sidewalk repairs. The sidewalk repair sections will be twenty feet or less in length. Each sidewalk repair area is marked with white paint. The scope of work for the sidewalk repairs shall be to saw cut the area, remove existing sidewalk, set forms, rebar, dowels, expansion joints as needed, place and finish new concrete sidewalk. Rebar shall be #3 bars on 16" centers, both ways. Concrete shall be a minimum of 5 sack cement per yard, limestone gravel, 3,000 psi ready mix concrete. Expansion joints shall be redwood or treated wood for ground contact.
AvailableSidewalk project.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Sidewalk project.
AvailableSidewalk Project.
Posted Date
Jan 6, 2026
Due Date
Feb 26, 2026
Release: Jan 6, 2026
Close: Feb 26, 2026
Sidewalk Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis