CityNJ
Aug 21, 2026
Closes
Sep 17, 2026
2025 Local Road Program – Phase 2 RFP
Work includes site clearing; soil erosion and sediment controls; maintenance and protection of traffic; milling and paving; replacement of concrete curb, Belgian block curb, sidewalk and driveway aprons; traffic striping and raised pavement markers; resetting of castings and valve boxes; repair and reconstruction of inlets and pipes; replacement of grates and curb pieces; regulatory and warning signs; and all else necessary or required to complete the work as shown on the Plans.