Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Lee County
Work includes bridge replacement and drainage improvements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Brownsville
Coffee Road Roadway, Drainage, and Utility Improvements Project. Work includes demolition, site grading, installation of storm drainage and water/wastewater utilities, roadway reconstruction, paving, striping, and associated traffic control includes 1,763 LF 24" class III RCP, 2 EA 4 foot diameter precast concrete manhole, 20 LF 6" DR-25 PVC fire line (incl. all reqd. fittings, restraints, and adapters), 3,150 LF 12" DR-25 PVC waterline (incl. all reqd. fittings, restraints, and adapters), 1,045 LF 12' SDR-35 PVC sanitary sewer line 0-8 foot depht, 20 LF 20" open cut steel casing.
Posted Date
Oct 18, 2025
Due Date
Dec 2, 2025
Release: Oct 18, 2025
City of Brownsville
Close: Dec 2, 2025
Coffee Road Roadway, Drainage, and Utility Improvements Project. Work includes demolition, site grading, installation of storm drainage and water/wastewater utilities, roadway reconstruction, paving, striping, and associated traffic control includes 1,763 LF 24" class III RCP, 2 EA 4 foot diameter precast concrete manhole, 20 LF 6" DR-25 PVC fire line (incl. all reqd. fittings, restraints, and adapters), 3,150 LF 12" DR-25 PVC waterline (incl. all reqd. fittings, restraints, and adapters), 1,045 LF 12' SDR-35 PVC sanitary sewer line 0-8 foot depht, 20 LF 20" open cut steel casing.
AvailableCity of Jacksonville
Drainage improvements consist of the contractor providing all labor, materials, and equipment necessary for the installation of drainage and roadway upgrades to address localized flooding and surface runoff issues. The scope consists of regrading shoulders to promote positive drainage, installing a concrete swale with associated riprap and turndown features, replacing full-depth pavement sections, and restoring disturbed areas with sod. Additional work includes mobilization, site preparation, dewatering, erosion control, utility coordination, and maintenance of traffic.
Posted Date
Oct 30, 2025
Due Date
Dec 4, 2025
Release: Oct 30, 2025
City of Jacksonville
Close: Dec 4, 2025
Drainage improvements consist of the contractor providing all labor, materials, and equipment necessary for the installation of drainage and roadway upgrades to address localized flooding and surface runoff issues. The scope consists of regrading shoulders to promote positive drainage, installing a concrete swale with associated riprap and turndown features, replacing full-depth pavement sections, and restoring disturbed areas with sod. Additional work includes mobilization, site preparation, dewatering, erosion control, utility coordination, and maintenance of traffic.
AvailableMadison County
Manufacture and deliver drainage structures for East Lake Road drainage improvements.
Posted Date
Nov 6, 2025
Due Date
Nov 20, 2025
Release: Nov 6, 2025
Madison County
Close: Nov 20, 2025
Manufacture and deliver drainage structures for East Lake Road drainage improvements.
AvailableLee County
Drainage and dirt road improvements. Road will need 3-36" existing culverts replaced with 4-48" HDPE culverts as well as building up the road over the pipes. Road will need 2-30" existing culverts replaced with 4-48" HDPE culverts. Road will need gravel approaches to each side of a bridge and well turn outs, rip rap and cleaning of the bridge.
Posted Date
Nov 7, 2025
Due Date
Dec 10, 2025
Release: Nov 7, 2025
Lee County
Close: Dec 10, 2025
Drainage and dirt road improvements. Road will need 3-36" existing culverts replaced with 4-48" HDPE culverts as well as building up the road over the pipes. Road will need 2-30" existing culverts replaced with 4-48" HDPE culverts. Road will need gravel approaches to each side of a bridge and well turn outs, rip rap and cleaning of the bridge.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis