Indiana Department of Transportation
State AgencyIN
Aug 5, 2026
Closes
Sep 2, 2026
B-44104-A Bridge Replacement RFP
Bridge replacement project.
Description: Work includes 925 CY of common excavation; 119 SY of subgrade treatment, type ii; 1,875 SY of subgrade treatment, type ic; 479 SY of geogrid, type ib; 2,480 SY of geotextile for pavement, type 2b; 113 SY of milling, asphalt, 1 1/2" ; 593 LF of joint adhesive; 12 LF of guardrail, mgs w-beam, 6' 3" spacing; 60 LF of curb, integral concrete, type b; 193 SY of reinforced concrete bridge approach, 12". See attached files.
StateAgency · IN, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to Indiana Department of Transportation.
Adjacent opportunities open for bidding right now.
Indiana Department of Transportation
State AgencyIN
Aug 5, 2026
Closes
Sep 2, 2026
Bridge replacement project.
Indiana Department of Transportation
State AgencyIN
Aug 5, 2026
Closes
Sep 2, 2026
Work consists of excavation, common, 2650 CY; excavation, rock, 45 CY; borrow, 5405 CY; excavation, waterway, 975 CY; excavation, X, 90 CY; excavation, foundation, unclassified, 75 CY; subgrade treatment, type II, 246 SY; aggregate for end bent backfill, 60 CY; Milling, transition, 140 SY; QC/QA-HMA, 2, 58s, surface, 9.5mm, 111 TN; guardrail end treatment, type I, 4 EA; guardrail, MGS W-beam, 6 ft 3-IN spacing, 38 LF; riprap, class 1, 1005 TN; riprap, revetment, 132 TN; seed mixture, type R, 214 LBS; topsoil, 10 CY; sodding, 143 SY. See outside link.
Indiana Department of Transportation
State AgencyIN
Aug 5, 2026
Closes
Sep 2, 2026
Work consists of construction engineering 1 LS; pavement removal, 494 SY; present structure, remove, structure no., 1 LS; fence right-of-way, remove, 130 LF; excavation, common 733 CY; stormwater management budget, 23998 DOL; excavation, foundation, unclassified, 1015 CY; subgrade treatment, type II, 132 SY; subgrade treatment, type IC, 3168 SY; aggregate for end bent backfill, 58 CY; milling, asphalt, 1 1/2-IN, 484 SY;gGuardrail connector system, w-beam, curved, type 2, 1 EA; guardrail, remove, 2196 LF; fence, farm field, 47-IN, 155 LF; paved side ditch, type A, 132 LF; erosion control blanket, 1384 SY; mulched seeding, type R, 1384 SY. See outside link.
Indiana Department of Transportation
State AgencyIN
Aug 5, 2026
Closes
Sep 2, 2026
Work includes 3,553 SY of subgrade treatment, type ic; 3,553 SY of geotextile for pavement, type 2b; 1,470 SY of transition milling; 7,219 LF of joint adhesive; 176 SF of terminal joint, retrofit polymer modified asphalt; 50 LF of guardrail, mgs w-beam, 6'3" spacing; 2,104 LF of milled hma corrugations, sinusoidal; 2,229 SY of erosion control blanket; 3,409 SY of mulched seeding, type r. See attached file.