Illinois Department of Transportation
State AgencyIL
Posted
-
Nov 6, 2026
012-80C66 - Bridge Deck Overlay, Bridge Joint Replacement and /Repair Include Deck and Approach Patching, and Substructure Repair
Work includes approx 3 CY earth excavation: 21 SY topsoil furnish and place, 4": 110 LF longitudinal joint sealant: 80 SY portland cement concrete surface removal - butt joint. See outside link.
