Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of an elevated storage tank, SCADA system, electrical, and related appurtenances.
Posted Date
Jan 19, 2026
Due Date
Feb 19, 2026
Release: Jan 19, 2026
Close: Feb 19, 2026
Construction of an elevated storage tank, SCADA system, electrical, and related appurtenances.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Excavation, earthwork, compacted fill placement and site grading; construction of elevated tank foundation and building superstructure; design and construction of a 2.0 MG composite elevated storage tank; installation of tank equipment and piping, including but not limited to chemical feed, interior piping and valves, floor drains and other general electrical work, instrumentation and control, and miscellaneous work associated; Construction of fences, gates, and other site modifications; Making tie-ins and installing valves as required to connect to existing pipelines; Construction of concrete driveway;
Posted Date
Jan 25, 2026
Due Date
Feb 19, 2026
Release: Jan 25, 2026
Close: Feb 19, 2026
Excavation, earthwork, compacted fill placement and site grading; construction of elevated tank foundation and building superstructure; design and construction of a 2.0 MG composite elevated storage tank; installation of tank equipment and piping, including but not limited to chemical feed, interior piping and valves, floor drains and other general electrical work, instrumentation and control, and miscellaneous work associated; Construction of fences, gates, and other site modifications; Making tie-ins and installing valves as required to connect to existing pipelines; Construction of concrete driveway;
AvailableWork includes 250,000 gallon elevated storage tank, water well no 6.
Posted Date
Jan 21, 2026
Due Date
Feb 16, 2026
Release: Jan 21, 2026
Close: Feb 16, 2026
Work includes 250,000 gallon elevated storage tank, water well no 6.
AvailableThis project's focused is the rehabilitation the village 150,000 gal elevated water storage tank by way of specified overcoating systems and miscellaneous repairs.
Posted Date
Dec 15, 2025
Due Date
Feb 5, 2026
Release: Dec 15, 2025
Close: Feb 5, 2026
This project's focused is the rehabilitation the village 150,000 gal elevated water storage tank by way of specified overcoating systems and miscellaneous repairs.