Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The major work consists of removing the existing sewer pumps and equipment, furnishing and installing new submersible pumps, piping, hatches, appurtenances, electrical equipment, controls, and programming.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the furnishing of all labor and material for the construction of Knights Avenue Lift Station Upgrades.
Posted Date
Nov 27, 2025
Due Date
Jan 7, 2026
Release: Nov 27, 2025
Close: Jan 7, 2026
This RFP is for the furnishing of all labor and material for the construction of Knights Avenue Lift Station Upgrades.
AvailablePremium
Access the largest public sector contact database
Release: Nov 26, 2025
Close: Jan 7, 2026
Lift station upgrades.
AvailableMajor Items of work include: 1. Sewer Lift Station Rehabilitation - 4 EA; 2. Pumping Equipment Rehabilitation - 4 EA; 3. Structural Concrete - 7 CY.; 4. Generators - 2 EA.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Major Items of work include: 1. Sewer Lift Station Rehabilitation - 4 EA; 2. Pumping Equipment Rehabilitation - 4 EA; 3. Structural Concrete - 7 CY.; 4. Generators - 2 EA.
AvailableWork consists of the construction of 104 LF of new 18" diameter SDR 26 PVC sewer, two manholes, connection to existing lines, bypass pumping, dewater lift station wet well and flush force main, trench safety, decommission lift station including remove pumps and service panel and deliver to public Works yard, remove generator and switch gear and deliver to animal shelter, break up concrete to fill hole, cover with soil and re-vegetate and water of disturbed areas, and SWPPP. The work also includes furnishing and installing fall protection grates at the Weaver Street Lift Station and Gateway Boulevard Lift station.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work consists of the construction of 104 LF of new 18" diameter SDR 26 PVC sewer, two manholes, connection to existing lines, bypass pumping, dewater lift station wet well and flush force main, trench safety, decommission lift station including remove pumps and service panel and deliver to public Works yard, remove generator and switch gear and deliver to animal shelter, break up concrete to fill hole, cover with soil and re-vegetate and water of disturbed areas, and SWPPP. The work also includes furnishing and installing fall protection grates at the Weaver Street Lift Station and Gateway Boulevard Lift station.