Open RFP

Braeswood N., Post Oak#2, Bissonnet#4, Brooklet NE., Sludge Transfer (Dorsett), and Synott Road#1 Lift Stations Renewal and Replacement Project

Description: Work includes 1000 CY extra hand excavation; 1000 CY extra placement of granular fill, incl. Haul off of material; 1000 CY extra cement stabilized sand; 100 CY extra replacement of backfill material; 100 CY extra machine excavation, incl. Haul off of material; 20 LF extra 8-inch diameter sewer forcemain by open-cut (ductile iron w/restrained joints); 50 tn extra ductile iron fittings; 1000 CY "extra concrete paving (11-in depth)"; 1 ea 8-ft dia. Bypass manhole structure as detailed in the drawings. Including all piping, coatings, fittings, valve, conc. Top w/ access hatch, painting, and all appurtenances, all depths, complete in place. (sheet 254) etc. See attached file.

Buyer
City of Houston

City · TX, US

Released
Sep 18, 2026
Closes
Oct 21, 2026(30 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts