Bradley Lake Expansion - 3-phase Powerline Tree Clearing
AEA to solicit bids for a tree clearing contract to clear a right of way for the Lake 3-phase power upgrade. This line will improve the electrical service and reliability to Dam and support Tunnel Boring Machine operations during construction of the Dixon-Bradley tunnel. Area of clearing is defined in attached drawings and sheet specifications. 30 ft swath, 2.68 miles. (STA 0+30 to STA 141+70). Tree clearing must take place outside of Bald and Golden Eagle disturbance windows (March 1 - Aug 31).