Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Allegany County Public School District
The Board of Education of Allegany County seeks sealed bids to replace the HVAC piping system at Braddock Middle School in Cumberland, MD, according to plans prepared by RTM Engineering, Inc. Bids are due by December 4, 2025 at 2:00 PM local time, with a 5% bid security, a 15% MBE participation goal, and substantial completion required by August 7, 2026.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Princeton Public Schools
HVAC Equipment Replacement at Middle School.
Posted Date
Nov 4, 2025
Due Date
Dec 9, 2025
Release: Nov 4, 2025
Princeton Public Schools
Close: Dec 9, 2025
HVAC Equipment Replacement at Middle School.
AvailableBridgewater-Raritan Regional School District
HVAC upgrades and boiler replacement at middle school
Posted Date
Nov 11, 2025
Due Date
Dec 5, 2025
Release: Nov 11, 2025
Bridgewater-Raritan Regional School District
Close: Dec 5, 2025
HVAC upgrades and boiler replacement at middle school
AvailableTownship of West Caldwell
Phase (01) consisting of removal, disposal, and replacement of the existing corridor ceiling and light fixtures for all floors. Existing ceiling-mounted systems on existing ceiling system to remain and be reattached to new ceiling system. New HVAC & Plumbing piping to bypass existing to be provided in corridor and rerouted to existing heat units & plumbing fixtures. Patching the existing roof deck/membrane, core drilling, masonry openings, partial wall demolition, and temporary removal of the existing ceiling grids inside rooms. Abatement at corridors. Phase (02): Existing HVAC & Plumbing piping inaccessible inside crawl spaces to be abandoned. New HVAC & Plumbing branch lines to tie-in to existing heat units & plumbing fixtures located inside rooms. Ceilings inside rooms to be modified to accommodate the new branch lines & tie-ins. Selective abatement at units & fixtures. System start-up & switchover; previous HVAC & Plumbing system to be removed to greatest extent possible.
Posted Date
-
Due Date
Dec 4, 2025
Township of West Caldwell
Close: Dec 4, 2025
Phase (01) consisting of removal, disposal, and replacement of the existing corridor ceiling and light fixtures for all floors. Existing ceiling-mounted systems on existing ceiling system to remain and be reattached to new ceiling system. New HVAC & Plumbing piping to bypass existing to be provided in corridor and rerouted to existing heat units & plumbing fixtures. Patching the existing roof deck/membrane, core drilling, masonry openings, partial wall demolition, and temporary removal of the existing ceiling grids inside rooms. Abatement at corridors. Phase (02): Existing HVAC & Plumbing piping inaccessible inside crawl spaces to be abandoned. New HVAC & Plumbing branch lines to tie-in to existing heat units & plumbing fixtures located inside rooms. Ceilings inside rooms to be modified to accommodate the new branch lines & tie-ins. Selective abatement at units & fixtures. System start-up & switchover; previous HVAC & Plumbing system to be removed to greatest extent possible.
AvailableGreenville Technical College
DESIGN/BUILD: Provide system replacement of HVAC systems, controls, cooling tower and doaz units.
Posted Date
Oct 21, 2025
Due Date
Nov 26, 2025
Release: Oct 21, 2025
Greenville Technical College
Close: Nov 26, 2025
DESIGN/BUILD: Provide system replacement of HVAC systems, controls, cooling tower and doaz units.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis