Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes grading, asphalt base cr, asphalt int cr, asphalt surface cr, 10" cmrb, portland cement for cmrb, 1'6" concrete c&g, removal and disposal items, signal work, and other miscellaneous items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of Redwash Road: removal and replacement of approximately 4.6 miles of roadway including widening and installation of culverts, retaining walls, guard rails, delineator posts, and signs. Single contract; bidders must also bid on one tied project (combined award). Mandatory pre-bid conference attendance required. Owner estimates total bid price ≈ $11,500,000.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
Construction of Redwash Road: removal and replacement of approximately 4.6 miles of roadway including widening and installation of culverts, retaining walls, guard rails, delineator posts, and signs. Single contract; bidders must also bid on one tied project (combined award). Mandatory pre-bid conference attendance required. Owner estimates total bid price ≈ $11,500,000.
Premium
Access the largest public sector contact database
IDOT is soliciting bids for roadway widening and hot-mix asphalt (HMA) resurfacing at the intersection of Waukegan Road (IL 43) and Westleigh Road in Lake Forest, Illinois. The work includes traffic signal modernization, lighting, curb and gutter, sidewalk improvements, and storm sewer components in District 1, Lake County. Bids are due at the January 16, 2026 letting at 12:00 PM Central Time.
Posted Date
Dec 5, 2025
Due Date
Jan 16, 2026
Release: Dec 5, 2025
Close: Jan 16, 2026
IDOT is soliciting bids for roadway widening and hot-mix asphalt (HMA) resurfacing at the intersection of Waukegan Road (IL 43) and Westleigh Road in Lake Forest, Illinois. The work includes traffic signal modernization, lighting, curb and gutter, sidewalk improvements, and storm sewer components in District 1, Lake County. Bids are due at the January 16, 2026 letting at 12:00 PM Central Time.
AvailableThe City of Fairburn is seeking bids for the construction of 0.73 miles of new roadway to access Duncan Park from Virlyn B. Smith Road, including widening for a right turn deceleration lane. The project requires coordination with property owners and adherence to specific construction and material standards.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
The City of Fairburn is seeking bids for the construction of 0.73 miles of new roadway to access Duncan Park from Virlyn B. Smith Road, including widening for a right turn deceleration lane. The project requires coordination with property owners and adherence to specific construction and material standards.
Wok includes 6,000 CY earthwork for open channels and retention basins; 104 CY riprap construction, dumped - angular d50=8"; 75 CY riprap construction, dumped - angular d50=12"; 29,000 SY subgrade preparation; 169 SY aggregate base course - 4" thick; 214 SY aggregate base course - 10" thick; 214 SY asphalt concrete pavement - type a 1/2" mix - 1.5" thick; 21,116 SY asphalt concrete pavement - type a 1/2" mix - 2" thick; 214 SY asphalt concrete pavement - type a 3/4" mix - 2. 5" thick; 20,913 SY asphalt concrete pavement - type a 3/4" mix - 3" thick; 10 ton tack coat; 2,721 LF sawcut asphaltic concrete pavement. See outside link.
Posted Date
Oct 30, 2025
Due Date
Dec 30, 2025
Release: Oct 30, 2025
Close: Dec 30, 2025
Wok includes 6,000 CY earthwork for open channels and retention basins; 104 CY riprap construction, dumped - angular d50=8"; 75 CY riprap construction, dumped - angular d50=12"; 29,000 SY subgrade preparation; 169 SY aggregate base course - 4" thick; 214 SY aggregate base course - 10" thick; 214 SY asphalt concrete pavement - type a 1/2" mix - 1.5" thick; 21,116 SY asphalt concrete pavement - type a 1/2" mix - 2" thick; 214 SY asphalt concrete pavement - type a 3/4" mix - 2. 5" thick; 20,913 SY asphalt concrete pavement - type a 3/4" mix - 3" thick; 10 ton tack coat; 2,721 LF sawcut asphaltic concrete pavement. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis