Retrieving RFP details
Release
Close
City of Fairburn
The City of Fairburn is seeking bids for the construction of 0.73 miles of new roadway to access Duncan Park from Virlyn B. Smith Road, including widening for a right turn deceleration lane. The project requires coordination with property owners and adherence to specific construction and material standards.
https_ssl_doas_state_ga_us_gpr_downloadAttachment_attachmentId_36999785_sourceSystemType_gpr20
City of Fairburn
Construction of total of 0.73 miles of new location roadway. Work includes approx. 143 TN mulch, 1 LS grading complete, 1,110 TN 12.5 MM recycled asphalt concrete superpave, 2,321 SY tack coat, 3,334 SY milling, 108 SY 8" concrete sidewalk, pavement marking, 186 LF handrail, 2,154 SY 18" storm drain pipe, 34 SF highway signs, 700 LF 4' barrier fence, 828 LF 8" PVC sanitary sewer pipe, 400 LF 8" DI sanitary sewer pipe, 4 EA sanitary sewer manhole, 3,816 LF 8" PVC water main, 2 EA water meter box and meter stops, 141 LF 1" PVC water service line, 62 EA lighting, 110 LF 2" rigid conduit, 230 LF 2" directional bore, 9 AC permanent grassing, fertilizer, sod, landscaping, erosion control.
Town of Winterville
Provide line relocation for u2817 NCDOT road widening project.
Earl Township
Storm Sewer and Road Widening Project – Include installation of 277 LF of 15" RCP, 7 inlet boxes, 6 endwalls, 534 SY of road widening along with temporary pavement restoration, removal of existing pipes and structures, and other incidental work.
Release
-
Close
Dec 12, 2025