Retrieving RFP details
Release
Close
Town of Queen Creek
Wok includes 6,000 CY earthwork for open channels and retention basins; 104 CY riprap construction, dumped - angular d50=8"; 75 CY riprap construction, dumped - angular d50=12"; 29,000 SY subgrade preparation; 169 SY aggregate base course - 4" thick; 214 SY aggregate base course - 10" thick; 214 SY asphalt concrete pavement - type a 1/2" mix - 1.5" thick; 21,116 SY asphalt concrete pavement - type a 1/2" mix - 2" thick; 214 SY asphalt concrete pavement - type a 3/4" mix - 2. 5" thick; 20,913 SY asphalt concrete pavement - type a 3/4" mix - 3" thick; 10 ton tack coat; 2,721 LF sawcut asphaltic concrete pavement. See outside link.
Power Road Widening - Riggs Road To Chandler Heights Road
zip
City of Olive Branch
The project consists of the construction of Craft Road Widening from College Road to Church Road in the City of Olive Branch MS.
City of Turlock
Work consists of 1,353 SF of remove asphalt, earthwork and grading, remove existing improvements, 877 LF of remove white stripe, 2 EA of remove sign, 1 EA of remove 1a traffic signal pole and signal heads, 1 EA of remove electrolier and base, 731 LF of minor concrete (curb and gutter), 5,763 sf of minor concrete (sidewalk and flatwork), 1 EA of pedestrian access ramp, 41 ton of hma paving patch, 738 ton of hma ac paving, 54,660 SF of crack treatment, 54,660 SF of slurry seal, 11 LF of street barricade, 3 EA of fire hydrant assemblies, 78 LF of 18" storm drain pipe, 2 EA of catch basin. See attached file.
Town of Avon
Road construction - HMA pavement construction, concrete pavement, sidewalk construction, shared-use path construction, storm sewer construction, driveway construction, and lighting construction.
Release
Oct 30, 2025
Close
Dec 02, 2025