City of Olive Branch
The project consists of the construction of Craft Road Widening from College Road to Church Road in the City of Olive Branch MS.
90-20251020101825 OLIVE BRANCH (1)
City of Turlock
Work consists of 1,353 SF of remove asphalt, earthwork and grading, remove existing improvements, 877 LF of remove white stripe, 2 EA of remove sign, 1 EA of remove 1a traffic signal pole and signal heads, 1 EA of remove electrolier and base, 731 LF of minor concrete (curb and gutter), 5,763 sf of minor concrete (sidewalk and flatwork), 1 EA of pedestrian access ramp, 41 ton of hma paving patch, 738 ton of hma ac paving, 54,660 SF of crack treatment, 54,660 SF of slurry seal, 11 LF of street barricade, 3 EA of fire hydrant assemblies, 78 LF of 18" storm drain pipe, 2 EA of catch basin. See attached file.
Adams County
Work includes overlay, milling, leveling, pipe replacement, site grading and striping.
Town of Avon
Road construction - HMA pavement construction, concrete pavement, sidewalk construction, shared-use path construction, storm sewer construction, driveway construction, and lighting construction.
Release
Oct 23, 2025
Close
Nov 24, 2025